My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-12_PERMIT FILE - M1997032
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1997032
>
2021-07-12_PERMIT FILE - M1997032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 9:55:38 AM
Creation date
7/13/2021 5:45:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997032
IBM Index Class Name
PERMIT FILE
Doc Date
7/12/2021
Doc Name
Request Final Reclamation State Update
From
Pinon Ridge Mining LLC
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pinon Ridge Mining LLC RECEIVED <br /> 31161 Highway 90, PO Box 825 JUL 1 <br /> 2021 <br /> Nucla, Colorado 81424-0825 2 - <br /> 970-864-2125 O MSION OF RECLAMATION <br /> MINING&WE-ry <br /> June 30, 2021 <br /> Mr. Dustin Czapla, Environmental Protection Specialist <br /> Colorado Division of Reclamation, Mining and Safety <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Re: Van 4 Shaft, Permit #M-1997-032, Request Final Reclamation State Update <br /> Dear Mr. Czapla, <br /> Reclamation at the Van 4 Mine in Western Montrose County as progressed with the demolition of <br /> one of the two buildings on site, the removal of the metal siding from the other building, the <br /> removal of the electric power poles and equipment and the plans for the removal of the headframe <br /> and ore bins. <br /> With the current Fire Ban in place in Montrose County,we cannot use cutting equipment to remove <br /> the steel frame of the remaining building or demolish the ore bins attached to the headframe. <br /> As soon as the Fire Ban is lifted, the building structures will be removed. Work will then take <br /> place to remove the headframe and structure. After it's removed, the shaft will be sealed and <br /> limited surface disturbance will be reclaimed. <br /> If you have further questions, please contact me. <br /> Sincerely, <br /> V, <br /> George E. GI ier, President <br />
The URL can be used to link to this page
Your browser does not support the video tag.