My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-01_REVISION - M2019053
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2019053
>
2021-07-01_REVISION - M2019053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 3:58:05 AM
Creation date
7/6/2021 6:33:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2019053
IBM Index Class Name
REVISION
Doc Date
7/1/2021
Doc Name
Request For Amendment To Permit
From
Kelly Trucking Inc.
To
DRMS
Email Name
JPL
JLE
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K4= KelleyTrucking,nc. <br /> Earthrnoving Contractors <br /> 6201 McIntyre Street . Golden,Colorado 80403 <br /> Ph#(303)2794150 Fax#(303)279-4799 <br /> Attachment 4 <br /> Check Dams(CD) EC-12 <br /> Description I <br /> Cheek dams are temporary grade amtmI _ <br /> stroelures placed in drainage channels to t <br /> limit the aoaivity of rum amlev by <br /> reducing flow wl-ity.Clock darn are <br /> typically constructed from rack,gravel <br /> bags,sand bags,or tmmotimes, <br /> propnetary devices.Reinforced cheek <br /> dams are typically constructedm fro ruck <br /> and wire gabinn.Ahlamgh the primary function of cheek dams is to duce the <br /> .<meny rfamccatrated flows,a <br /> ewndary hncfit is scd.mcm tapping 1-ta is eo-t.ao,k<n vt dam,m s ravbwv dash.rn„w <br /> upstream nfthc structue <br /> . s�anesy afwwT. <br /> Appropriate Uses <br /> use es a",control for tempnmry drainage ditches su swat,,,mil final wil rabil-tism measures are <br /> established upstream and dowmstremn.Check dam,can be used on mild m modemicly,steep slopes. <br /> Check darns may be used We,the following com irions: <br /> • As temporary,grade control facilities along wolawaye unlit final sabiliention is established. <br /> • Along pemenent,wales that need protection prior to instsllation ofa moa-erodible lining. <br /> • Along temporary channels,ditches or swelm that need protection where construction of a non- <br /> erodible living is not practicable. <br /> Reinforced check dams should be used in areas subject to high flow velocities. <br /> Design and Installation <br /> Place check dams at regularly spaced intervals along the drainage swale or ditch.Check damn heights <br /> should allow far pools to develop upsa am of each check dam,extending to the downstream toe of the <br /> check dam immediately upstream. <br /> When rock is used for the check dam,place rock mechanically or by hand.Do not dump rocks into the <br /> drainage channel.Where multiple check dawn are used,the top of the Iowa dam should be at the same <br /> elevation as the toe of the upper dam. <br /> When reinforced check dams are,used.install erosion control fabric under and around the check dam to <br /> prevent erosion on the upstream and do,moc.'sides.Each Cheek Dame <br /> section of the dam should be keyed in to reduce the potential <br /> for washom m undecommg.A rock apron upstream and pig <br /> downstream of the dam may be necessary to further-moot Erosion Control Yes <br /> answm SedimentC ntrol Moderate <br /> SiteT1aterial Mam cram No <br /> Nowenter 2010 Urban Drainage and Flood Control District CD-1 <br /> Urban Sturm Drainage Criteria Manual Volume d <br /> EC-12 Check Dams(CD) <br /> Design details with notes are provided for the following types of check dams: <br /> Rock Check Dave(CD-1) <br /> • Reinforced Check Dams(CD-2) <br /> Sediment control logs may also be used as check dams;however,it,tence is not appropriate for use as a <br /> checkdam.Manyjurlsdicdom also prohibit or discourage we ofstraw bales for this purpose. <br /> Maintenance and Removal <br /> Replace missing rocks causing voids in the check dam.If gravel bags or sandbags are used,repl—m <br /> repair tom or displaced bags. <br /> Remove accumulated sediment,as needed to maintain BMP effectiveness,typically before the sediment <br /> depth upsueam of the check dam is within'%of the crest height.Remove accumulated sediment ptior to <br /> nmlchm"seeding,en chemical soil nabiliution.Removed sediment can be inemporated into the <br /> earthwork with approval lion the Project Engineer,or disposed of at an alternate location in accordance <br /> with the standard speciticatiom. <br /> Check am n dam in parna wales should be removed when paenand grasses have become <br /> esmblished.or immediately priorro installation ofa non-erWible lining.All of the rock and accumulated <br /> sediment should be remured,and the area seeded and mulched or otherwise stabilized. <br /> CD-2 Urban Drainage and Flood Control District November 2010 <br /> Urban Storm Drainage Crieria Manual Volume 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.