Laserfiche WebLink
Table 7 Hydrological Monitoring Summary <br /> Sampling Point Schedule IL <br /> status <br /> Treatment Plant Sample weekly during Ongoing; sampling conducted as <br /> Discharge discharge required during discharge events. <br /> Treatment and discharge has been <br /> suspended as of December 9, 2009 <br /> until further notice. <br /> Whirlwind Sample for 2 quarters and Completed <br /> Decline (Sump) measure flow for 4 <br /> quarters <br /> Packrat Mine Sample for 2 quarters Not Started; the Packrat Mine is not <br /> Water when accessible yet accessible. <br /> DP Spring Measure flow quarterly Ongoing <br /> PR Spring Sample and measure flow Completed <br /> quarterly for 5 quarters <br /> Measure flow quarterly Ongoing <br /> and sample annually <br /> thereafter <br /> Monitoring Well 8 samples over 15 months Completed <br /> W-1 Measure quarterly and Ongoing <br /> sample annually thereafter <br /> Lumsden Canyon As needed in support of Completed; Two samples collected <br /> Hydrogeological Report to from 3 points in Lumsden Canyon. <br /> be prepared by Western No further sampling events are <br /> Water&Land scheduled at this time. <br /> Seep Surveys Annually On oin <br /> Rajah 49 Mine, Sample as discharge is Ongoing <br /> Thornton Portal observed in annual seep <br /> (Rajah Spring) surveys <br /> Waste Rock Collect grab sample Suspended; 1 annual composite <br /> quarterly and composite sample collected to date. Sampling <br /> annually for analysis suspended until mining resumes. <br /> Sediment Pond Sample quarterly if Ongoing Monitoring; no samples <br /> Sampling discharging collected to date. <br /> Dolores River Sample during treatment Suspended; not required until water <br /> Sampling discharge if flowing into treatment plant resumes operation. No <br /> Dolores River samples collected to date. <br />