Laserfiche WebLink
Of COlO <br /> �� 99 <br /> � $ COL M2005-065 TRO2 1, MINING AND SAFETY <br /> * - x Complied! ph(303)866-3567 ,��D <br /> "la76 ` 0 Minor Infractions 0 Violations <br /> LJW/thm m <br /> REQUEST FOR TECHNICAL REVISION ( IK) COVER SHEET ,IUN 29 Z0Zl <br /> ZOOK 45 T'_,,\r1 t4, Vi non ( V4(.c s' TO <br /> File No., M - Site Name: VA(- (- r -MC <br /> County S c, N .1 L. r,r\ TR# DRMS Use onto <br /> Permittee: "t <br /> Operator(If Other than Permittee): 11,1 I YYI • (^ et : (kL n,j 4;�• I <br /> 111 , <br /> Permittee Representative: C(c.L S `a f <br /> Please provide a brief description of the proposed revision: _A AA G Li`�'���j 'S �t��'�►'\ <br /> l t }- f' } <br /> <,t..)!a C. l a,,L 1`_U r �; "�ICI j Jf <br /> C Ot�•C'.{' � �� <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 <br /> 110d, I I2d(1, 2 or 3) $1006 <br />