Laserfiche WebLink
Part of Technical Revision for Menzer Quarry <br /> (M-1973-009-HR) submitted in June 2021 <br /> Diagram of Storm Water Discharge Method 1 Notes <br /> \ \ \ Pump will be removed after <br /> dewatering of pond is done <br /> to avoid possible loss of the <br /> southeast corner �� pump in the event of a <br /> of processing and �� <br /> stockpile area <br /> \ -- Intake hose may be on a <br /> removable floating structure <br /> \ to keep the actual intake off <br /> 6652.7 _. -- the surface of the sediment. <br /> If sediment into the sock <br /> filter is too great then use <br /> ` support to draw water from <br /> Jculvert the upper portion of the <br /> intakes pond. <br /> 3 <br /> i` <br /> sediment 6645.2 <br /> basin and pump <br /> pond Intl outlet silt <br /> \ hose ose fe;ice <br /> 6650.9 <br /> sock"$fiRere <br /> filter Water q�d <br /> ter e -1c rry \ <br /> --� --- w ter A c <br /> eS <br /> as <br /> - contour interval = 5' <br /> North <br /> F <br /> III L)� <br />