Laserfiche WebLink
COLORADO LEGACY LAND <br /> $CHWARTZWALDER MINE <br /> approximately 400 ft below the Steve level.The pump will be shut down during those months the WTP is not <br /> operating and as described above,the last three years of operating this way has demonstrated that the mine <br /> pool level has remained stable below the regulatory limit. <br /> The WTP operating strategy is considered in conjunction with in-situ treatment of the mine pool. During the <br /> period in which the WTP is shut down, in-situ treatment of the mine pool shall be conducted, as needed, to <br /> maintain chemical stabilization. The criteria for in-situ treatment of the mine pool shall be when the mean <br /> annual concentration of dissolved uranium indicates an increasing trend as compared to the prior year. <br /> EA WATER QUALITY MONITORING PLAN <br /> This Exhibit has not changed from the 2021 Mine Plan Amendment S. <br /> JUNE 2021 26 AMENDMENT 6 <br />