Laserfiche WebLink
PERMIT #: M-2008-076 <br />INSPECTION DATE: June 9, 2021 <br />EQUIPMENT HAUL DISTANCE and Time <br /> <br />Nearest Major City or Town within project area region: TRINIDAD <br />Total one-way travel distance: 23.00 miles <br />Average Travel Speed: 55.00 mph <br /> <br />Total Non-Roadable Mob/Demob Cost * <br />$6,442.11 <br /> <br />Total Roadable Mob/Demob Cost ** <br />$194.39 <br />** one round trip, no haul rig: <br /> <br />Transportation Cycle Time: <br /> <br /> <br />Non-Roadable <br />Roadable <br />Equipment <br />Equipment <br />Haul Time (Hours): 0.42 0.42 <br />Return Time (Hours): 0.42 0.42 <br />Loading Time (Hours): 0.50 NA <br />Unloading Time (Hours): 0.50 NA <br />Subtotals: 1.84 0.84 <br /> <br />JOB TIME AND COST <br /> <br />Hours <br /> Total job time: 3.67 <br /> <br /> <br /> <br />Total job cost: <br />$6,636 <br /> <br /> <br /> <br /> <br />Page 2 of 19 <br />