Laserfiche WebLink
DOZERGRADER WORK <br /> <br />Task description: <br />Backfill/Grade - Area 2 <br /> <br />Permit Action: <br />Robinson Sons Gravel Pit No. <br />Site: June 9, 2021 cost Permit/Job#: M2008076 <br />1 <br /> <br />PROJECT IDENTIFICATION <br /> <br />Task #: 010 State: Colorado Abbreviation: None <br />Date: 6/15/2021 County: Las Animas Filename: M076-010 <br />User: DC1 <br /> <br /> <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br /> <br />Cat D9T - 9SU <br />Basic Machine: <br />Horsepower: <br /> <br />Blade Type: <br /> <br />Attachment:3-shank ripper <br />Shift Basis:1 per day <br />Data Source: <br /> <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $156.88 NA <br />Operating Cost/Hour: $127.87 100 <br />Ripper own. <br />$15.59 NA <br />Cost/Hour: <br />Ripper op. Cost/Hour: $1.53 15 <br />Operator Cost/Hour: $41.30 <br />NA <br /> <br />Total unit Cost/Hour: $343.17 <br />Total Fleet Cost/Hour: <br />$343.17 <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $343.17/LCY <br /> <br />Total job time: 8.00 Hours <br />Total job cost: <br />$2,745 <br /> <br /> <br /> <br />