Laserfiche WebLink
Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 0.903 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.868 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.5270 <br /> <br />Adjusted unit production: 1,112.23 LCY/hr <br />Adjusted fleet production: 1112.23 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.309/LCY <br /> <br />Total job time: 1.08 Hours <br />Total job cost: <br />$370 <br /> <br /> <br /> <br /> <br />