My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-21_PERMIT FILE - M2021018
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021018
>
2021-06-21_PERMIT FILE - M2021018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 11:27:46 AM
Creation date
6/22/2021 6:16:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021018
IBM Index Class Name
PERMIT FILE
Doc Date
6/21/2021
Doc Name
Adequacy Review Response #2
From
Ed Lyons
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stream Diversion Reclamation: All berms created will be recontoured and spread thoughout the <br /> reclaimed site. Sediment 4inch rock if needed, will be removed. <br /> Access Road:The entrance and access road will be regraded and recontoured followed by <br /> ripping/scarifying and reseeding, culvert will be taken out and sloped and seeded. If erosion is an issue <br /> straw or geotextiles will be used for stabilization. <br /> Reclamation Costs: topsoil and overburden for reclamation will depend on the area disturbed. We <br /> are going in 2 phases, 1" phase will be 4 acres, second phase is 5.93 acres. We will also be mining <br /> towards reclamation.We will put our processing area on bottom elevation and push materials down <br /> from higher elevation to processing area so everyday will be working towards reclamation. We do <br /> not plan on making a huge hole to mine,will take down slopes and push to process, so when its time <br /> to reclaim slopes will be close to the required 3-1, and 2-1.According to NRCS there will plenty of <br /> reclamation material to put back 6 inches of materials, approx.8010 cubic yards for 9.93 acres. <br /> Grade out with overburden/topsoil scarfire and broadcast seed,will have on site if needed 770 <br /> grader, D6 dozer, 938 loader, mini excavator, broadcaster, dump truck, and access road material will <br /> also be used for reclamation. <br /> 5-ldfr5 <br /> 11'aC le, VY\cL <br /> Final reclamation will be done in a timely manner(within 6 months of shutdown date) <br /> Equipment and portable office will be removed <br /> Reclamation of slopes,and graded out positive drainages applied. <br /> Reclamation Cost Estimate$8500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.