Laserfiche WebLink
Table 6 <br /> Bowie No.1 Mine Bond Release History <br /> Initial Liability East Mine West Mine Loadout Total Comments <br /> Includes indirect costs pro- <br /> RN-04 Estimate $2,813,527.78 $1,059,606.98 $3,006,455.35 $6,879,590.11 rated for each area. <br /> All MRs/TRs after RN-04 and <br /> Revisions $118,677.31 $6,998,267.43 prior to SL-02 <br /> Surety Releases to Dal East Mine West Mine Loadout Total Comments <br /> SL-01 $0.00 $0.00 $0.00 $0.00 Application Withdrawn <br /> Phase I release on portions <br /> of the east and west mines <br /> SL-02 $434,803.00 $709,004.00 $0.00 $1,143,807.00 (13.1 ac and structures on <br /> the West Mine and <br /> structures only on the East <br /> Mine) <br /> 60%of total structural <br /> SL-03 $0.00 $0.00 $1,136,354.00 $1,136,354.00 demolition costs for all <br /> structures included in bond <br /> release. <br /> SL-04 $1,278,543.70 $0.00 $0.00 $1,278,543.70 Phase I release on 69.6 ac of <br /> the East Mine <br /> Phase I I release on 13.1 ac <br /> of the West Mine and 10.2 <br /> ac of Phase 11 release on the <br /> East Mine; Phase I release <br /> SL-05 $76,677.16* $197,166.37* $0.00 $175,373.56* of 1.0 acres of the West <br /> Mine Fan Area. *per Rule <br /> 3.03.1(2) $98,469.97 was <br /> deducted to ensure the <br /> minimum retention <br /> amount was achieved <br /> Phase I release on 2.31 <br /> acres associate with the <br /> West Ridge Pond, Binwall <br /> Ponds 1 through 4,and the <br /> ROM Pile Pond; Phase 11 <br /> SL-06 $484,986.72 $0.00 $0.00 $484,986.72 release of 58.84 acres of the <br /> East Mine composed of the <br /> 48.88 acres of to east Mine <br /> and 9.96 acres of land <br /> assocated with the Haul <br /> Road cut and fill. <br /> Phase I I release on .51 acres <br /> of the East Mine ROM Pond <br /> SL-07 $50,653.84 $0.00 $0.00 $50,653.84 and 10.38 Phase II I release <br /> of the ROM Pond and Pile <br /> Area. <br /> Permit Number G1981-038 Page 14 of 14 <br />