My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-15_GENERAL DOCUMENTS - C1981038
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981038
>
2021-06-15_GENERAL DOCUMENTS - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:49:46 AM
Creation date
6/18/2021 8:47:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
General Documents
Doc Date
6/15/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
Type & Sequence
SL7
Permit Index Doc Type
Findings
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6 <br /> Bowie No.1 Mine Bond Release History <br /> Initial Liability East Mine West Mine Loadout Total Comments <br /> Includes indirect costs pro- <br /> RN-04 Estimate $2,813,527.78 $1,059,606.98 $3,006,455.35 $6,879,590.11 rated for each area. <br /> All MRs/TRs after RN-04 and <br /> Revisions $118,677.31 $6,998,267.43 prior to SL-02 <br /> Surety Releases to Dal East Mine West Mine Loadout Total Comments <br /> SL-01 $0.00 $0.00 $0.00 $0.00 Application Withdrawn <br /> Phase I release on portions <br /> of the east and west mines <br /> SL-02 $434,803.00 $709,004.00 $0.00 $1,143,807.00 (13.1 ac and structures on <br /> the West Mine and <br /> structures only on the East <br /> Mine) <br /> 60%of total structural <br /> SL-03 $0.00 $0.00 $1,136,354.00 $1,136,354.00 demolition costs for all <br /> structures included in bond <br /> release. <br /> SL-04 $1,278,543.70 $0.00 $0.00 $1,278,543.70 Phase I release on 69.6 ac of <br /> the East Mine <br /> Phase I I release on 13.1 ac <br /> of the West Mine and 10.2 <br /> ac of Phase 11 release on the <br /> East Mine; Phase I release <br /> SL-05 $76,677.16* $197,166.37* $0.00 $175,373.56* of 1.0 acres of the West <br /> Mine Fan Area. *per Rule <br /> 3.03.1(2) $98,469.97 was <br /> deducted to ensure the <br /> minimum retention <br /> amount was achieved <br /> Phase I release on 2.31 <br /> acres associate with the <br /> West Ridge Pond, Binwall <br /> Ponds 1 through 4,and the <br /> ROM Pile Pond; Phase 11 <br /> SL-06 $484,986.72 $0.00 $0.00 $484,986.72 release of 58.84 acres of the <br /> East Mine composed of the <br /> 48.88 acres of to east Mine <br /> and 9.96 acres of land <br /> assocated with the Haul <br /> Road cut and fill. <br /> Phase I I release on .51 acres <br /> of the East Mine ROM Pond <br /> SL-07 $50,653.84 $0.00 $0.00 $50,653.84 and 10.38 Phase II I release <br /> of the ROM Pond and Pile <br /> Area. <br /> Permit Number G1981-038 Page 14 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.