Laserfiche WebLink
Table 1 <br /> Maximum Bond Release Amounts per Rule 3.03.1(2) <br /> East Mine West Mine Loadout Total <br /> Phase 1 - 60% $1,759,323.06 $635,764.19 $1,803,873.21 $4,198,960.46 <br /> Phase II - 25% $733,051.28 $264,901.75 $751,613.84 $1,749,566.87 <br /> Phase III - 159 $439,830.77 $158,941.05 $450,968.30 $1,049,740.12 <br /> Total 1 $2,932,205.11 $1,059,606.99 1 $3,006,455.35 1 $6,998,267.43 <br /> Table 2 presents the proposed release amounts by phase, calculated using the percentage of area and the <br /> allowable percentages of release (25 percent for Phase H and 15 percent for Phase III). For example,the <br /> East Mine Phase III release is calculated as follows: <br /> $2,932,205.11 * 10.65% * 15%=$46,841.98. <br /> Table 2 <br /> Proposed Release Under SL-07 <br /> East Mine West Mine Loadout <br /> Propose <br /> Proposed %of Proposed %of d %of <br /> Released Acres Acreage Release Acres Acreage lReleased Acres Acreage <br /> Phase II $31811.87 0.51 0.52% $0.00 0.00 0.000/0 $0.00 0.00 0.00% <br /> Phase III $46,841.97 10.38 10.65% $0.00 0.00 0.000/0 $0.00 0.00 0.00% <br /> Tota 1 $50,653.84 <br /> The following three paragraphs and Table 3 are included to retain historical information regarding the <br /> bond release process at the Bowie No. I Mine. This information is not directly pertinent to SL-07. <br /> The Division conducted a review ofprevious bond release decisions(SL-02, SL-03, and SL-04)during the <br /> SL-05 bond release. The Division determined that the amount ofliabilitypreviously released was in excess <br /> of the amounts allowed by Rule 3.03.1(2). A comparison of previously released amounts relative to the <br /> maximum amounts allowed is shown in Table 3. <br /> The maximum release amount for SL-02 was based on the$6,879,590.12 RN-04 total. With the approval <br /> of SL-02, the Division granted Phase I release on 13.1 acres and approved the release of$709,004.00. <br /> However, the release total should have been no more than $473,199.29 (74.43% (13.1 acres/17.6 acres) <br /> of 60%of the original RN-04 liability for the WestMine of$1,059,606.99). Therefore, the Division "over- <br /> released"$235,804.71 ($709,004.00-$473,199.29)when it approved SL-02. <br /> With the approval of SL-03 and SL-04, the Division released$1,713,346.70. However, the total release <br /> amount associated with the SL-03 and SL-04 approvals should have been no more than $1,204,977.69 <br /> (71.38%(69.6 acres/97.5 acres)of 60%of the original RN-04 liability for the East Mine of$2,813,527.80). <br /> Therefore, SL-03 and SL-04 "over-released" a total of$508,369.01 ($1,713,346.70 - $1,204,977.69). <br /> Note that the value of$2,813,527.80 is shown in Table 6 below. <br /> Permit Number G1981-038 Page 11 of 14 <br />