Laserfiche WebLink
June 11,2021 C-1983-059/Terror Creek Loadout LDS <br /> Inspection Topic Summary <br /> NOTE: Y Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> R -Availability of Records N -Reclamation Success <br /> N -Backfill&Grading R -Revegetation <br /> N -Excess Spoil and Dev.Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> N -Hydrologic Balance N - Signs and Markers <br /> R -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> N -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a complete inspection by Leigh Simmons of the Division of Reclamation,Mining and Safety <br /> (Division).The weather was clear,hot and dry. There was no activity at the site, and no sign of any recent <br /> disturbance. <br /> AVAILABILITY OF RECORDS—Rule 5.02.4(1): <br /> Records were available at the mine office,details are given at the end of this report. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> No activity appeared to have occurred at the site since the last inspection, and the site was secure behind a <br /> locked gate. <br /> REVEGETATION—Rule 4.15 <br /> Vegetative Cover;Timing: <br /> Vegetation at the site had dried out considerably in the hot weather. The flat pad area had not been seeded, <br /> but opportunistic annuals had begun to spread across the surface. <br /> DOCUMENTS RECEIVED <br /> N/A <br /> OTHER(SPECIFY) <br /> N/A <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 2 of 5 <br />