My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-14_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2021-06-14_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 1:41:14 PM
Creation date
6/15/2021 7:16:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
6/14/2021
Doc Name
Water Monitoring - Groundwater and Surface Water
From
Battle Mountain Resources. Inc.
To
DRMS
Annual Report Year
2021
Report Quarter_Month
May
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2-Monthly Piezometer Elevations <br /> Monitoring Well Piezometer Depth Depth to Water Depth of Water <br /> Identification Observation Date ft ft ft <br /> P6 05/27/2021 72.46 DRY N/A <br /> P7 05/27/2021 92.50 92.28 0.22 <br /> P8 05/27/2021 97.51 96.60 0.91 <br /> P9 05/27/2021 72.30 71.91 0.39 <br /> P10 05/27/2021 58.30 57.61 0.69 <br /> PH 05/27/2021 41.80 41.40 0.40 <br /> P12 05/27/2021 41.71 41.66 0.05 <br /> P13 05/27/2021 41.34 41.02 0.32 <br /> P14 05/27/2021 41.24 DRY N/A <br /> P15 05/27/2021 41.10 1 40.86 0.24 <br /> The leak detection system at the LTF Collection Pond was inspected May 27, 2021 and 860 gallons were <br /> evacuated from the leak detection system and pumped to the LTF. The LTF underdrain system was visually <br /> inspected May 27,2021 and the flow rate was measured to be approximately 31.0 gallons per minute(gpm). <br /> West Pit Waste Water Treatment Plant <br /> During the month of May 2021, the West Pit Waste Water Treatment Plant (WWTP) was operated <br /> intermittently (3 to 4 days per week) under Colorado Department of Public Health and Environment <br /> (CDPHE) CDPS Permit No. C00045675 for discharge into the Rito Seco alluvial aquifer. During the <br /> month, 7,352,100 gallons (22.6 acre-feet) of treated water was discharged to the Rito Seco and 449,500 <br /> gallons (1.38 acre-feet) of water was transferred from the West Pit to the Lined Tailing Facility (LTF). <br /> Additionally, no water was reinfiltrated into the West Pit and there was no sludge transferred from the <br /> WWTP drying pad to the LTF. <br /> BMRI performed the monthly visual seepage expression inspections on May 27, 2021 in the historic <br /> seepage area identified in Figure 2 of the permit. No seepage expressions were observed in the historic <br /> seepage area. <br /> BMRI measured the monthly West Pit backfill, alluvial and monitoring wells as required under in the <br /> QA/QC Plan. Measurements obtained for the monthly wells are shown in Table 3. <br /> Table 3-Monthly and Quarterly Groundwater Depth to Water <br /> Nlonituring Well Identification Observation Date Depth to Water <br /> ft <br /> BF-4 05/27/2021 25.01 <br /> BF-511 05/27/2021 30.90 <br /> BF-6 05/27/2021 31.04 <br /> M-6 05/27/2021 DRY <br /> M-7 05/27/2021 DRY <br /> M-8 05/27/2021 DRY <br /> NI-9 05/27/2021 141.52 <br /> M-10 05/27/2021 23.93 <br /> M-11R 05/27/2021 37.59 <br /> M-12 05/27/2021 174.64 <br /> M-13R 05/27/2021 125.85 <br /> M-14 05/27/2021 130.69 <br /> M-16 05/27/2021 22.40 <br /> M-17 05/27/2021 28.32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.