My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-14_REVISION - M2012032 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-06-14_REVISION - M2012032 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 7:28:02 AM
Creation date
6/15/2021 7:01:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
6/14/2021
Doc Name
Adequacy Review Response
From
Ouray Silver Mines, Inc.
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part 2: General Facility Information <br /> Name: Ouray Silver Mine Inc. - Revenue Mine <br /> Address: 1900 Main Street <br /> PO Box 564 <br /> Unit 1 <br /> Ouray, CO 81427 <br /> Type: Underground metal mine <br /> Date of Initial Operations: Mine Operations started in early 2013. <br /> Owner/Operator: Ouray Silver Mines Inc. <br /> 1900 Main Street <br /> PO Box 564 <br /> Unit 1 <br /> Ouray, CO 81427 <br /> Primary contact: Todd Jesse, Environmental Specialist <br /> Work: 970-325-7241 Cell: 720-469-7557 <br /> Email: tjesse@ouraysilvermines.com <br /> Matt Juth, Mine General Manager <br /> Work: 970-325-7241 Ext. 1025 <br /> Email: mjuth@ouraysilvermines.com <br /> 2.1 Facility Description <br /> The Revenue Mine is located along Sneffels Creek along Yankee Boy Basin Road, approximately five <br /> miles southwest of Ouray, CO. The permit facilities are not within a 100 year floodplain. The site is <br /> an underground metal mine and surface facility site. The Site Plan included shows the details of <br /> the surface facilities. As shown on the SPCC Plan Map the mill that processes the ore mined from <br /> the Revenue Mine is located underground onsite. The chemicals and materials listed in this Plan are <br /> used in the Revenue Mill. The main mill tunnel is be graded at a minimum of 1% away from the mill <br /> portal to contain spills. Sumps are in the following areas: Ball Mill, Flotation Circuit, Crushing <br /> Gallery, Filter Building and the Reagent Room. The Reagent Room has an epoxied concrete floor <br /> with vertical curbs to prevent releases of chemicals outside of the building. <br /> 2.2 Chemical List <br /> Various chemicals will be stored on site for use in the milling operation. All powder/granular <br /> chemicals will eventually be mixed with water and stored in tanks on site. All chemicals are listed <br /> below in the form they are received from the manufacturer. <br /> Materials Containment Plan (MCP) Page 8 of 33 May 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.