My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-14_REVISION - M2012032 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-06-14_REVISION - M2012032 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2025 6:33:30 AM
Creation date
6/15/2021 6:50:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
6/14/2021
Doc Name
Decision Date Extension Request
From
Ouray Silver Mines, Inc.
To
DRMS
Type & Sequence
TR12
Email Name
LJW
ACY
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pipe Une Number Associated Equipment Process Piping Estimated Length and Fitting Table <br /> Size Service Material Seq.# Start End Length of Pipe(ft) LR90deg Elbows LR60deg Elbows LR45deg Elbows LR22.Sdeg Elbows Tees Flanges <br /> 2OD-PPS-xx PAN <br /> FEEDER AREA SUMP BYOWNER BYOWNER - - - - - - <br /> X" SL SDRX XXX PUMP <br /> 206PPS-xx CRUSHER BYOWNER BYOWNER - - - - - - <br /> X" SL SDRX XXX AREA SUMP PUMP <br /> 200-PPS-01 CRUSHER BYOWNER BYOWNER - - - - -X. SL SDRX XXX AREA SUMP PUMP <br /> SEE 300—MP-004 FOR UTILITY PIPING <br /> s <br /> 0 <br /> a <br /> a <br /> a <br /> 0 <br /> a <br /> c� <br /> w <br /> 0 <br /> 3 <br /> c <br /> 0 <br /> i <br /> i <br /> r <br /> 0 <br /> 0 <br /> a <br /> U <br /> Q <br /> O <br /> I <br /> mI <br /> Q <br /> N <br /> 6 <br /> 2 <br /> m <br /> � o <br /> 0 <br /> i <br /> a <br /> i a <br /> m a <br /> n <br /> m — <br /> n E <br /> ao e <br /> ~I <br /> b <br /> �I <br /> 3 <br /> a, v <br /> ? pQp,00 LICE2 <br /> VO�:GOTT Mic::`c0 <br /> E0052024 THE DESIGN DRAWINGS FOR THIS PROJECT HAVE BEEN PREPARED <br /> m <br /> q p UTILIZING SPECIFIC MAKES AND MODELS OF EQUIPMENT. IF THE FINAL <br /> .y EQUIPMENT SELECTED FOR CONSTRUCTION DIFFERS FROM THE <br /> EQUIPMENT USED FOR THE DESIGN,THE CONTRACTOR IS RESPONSIBLE <br /> SS/AjAXX.EN FOR THE ENGINEERING AND DESIGN OF MODIFICATIONS REQUIRED FOR <br /> A COMPLETE AND FUNCTIONAL INSTALLATION AND FOR ENSURING THAT <br /> i cai THE PERFORMANCE REQUIREMENTS OF THE PROJECT ARE MET. ISSUED FOR CONSTRUCTION <br /> a' <br /> a c BO CLIENT — _ '� Project Office: Dote AS SHOWN BARR PROJECT No. <br /> InI PROCESS PLANT UPGRADES <br /> $ CONSTRUCTION — — — ze n — —— BAR <br /> ENGINEERING CO. 4/13/17 Os 46-10D1.00 <br /> 3126 14TH AVENUE EAST Drew DAK OURAY SILVER MINES, INC. REVENUE VIRGINIUS MINE CLIENT PROJECT No. <br /> - -- - - -_-_BARR HIBBING, MN 55746 checkedPG.J - <br /> 0 DAK PGJ DSM 4728717 ISSUED FOR CONSTRUCTION A B C 0 1 2 3 Faz:t(288 2262-E480 AM63/JAK3 �U�Y, COLORADO PIPING - PROCESS <br /> aCorporate Heodquertt : Designed DWG. No. REV. No. <br /> 6 NO. BY HK APP. DATE REVISION DESCRIPTION TO/FF'OR DATE RELEASED Ph:Minn1O800—32—277 www.bam'coT Approved DETAIL - ESTIMATED PIPE LENGTHS AND FITTINGS <br /> DSM 200-MP-003 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.