My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-11_GENERAL DOCUMENTS - C1981014
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981014
>
2021-06-11_GENERAL DOCUMENTS - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:09:46 PM
Creation date
6/11/2021 10:20:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
General Documents
Doc Date
6/11/2021
Doc Name Note
Southfield Termination
Doc Name
Correspondence
From
Dr. Corley
To
DRMS
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/11/2021 State.co.us Executive Branch Mail-Fwd: Southfield termination <br /> STATE OF DRMS_CoalAdmin -DNR, DNR<dnr drms_coal_admin@state.co.us> <br /> COLORADO <br /> Fwd: Southfield termination <br /> 1 message <br /> Trujillo- DNR, Zach <zach.trujillo@state.co.us> Fri, Jun 11, 2021 at 8:20 AM <br /> To: DNR DRMS_CoalAdmin - DNR<dnr—drms—coal—admin@state.co.us> <br /> Correspondence from Landowner to Division regarding Southfield Mine (C-1981-014). <br /> ---------- Forwarded message --------- <br /> From: Trujillo - DNR, Zach <zach.trujillo@state.co.us> <br /> Date: Fri, Jun 11, 2021 at 8:18 AM <br /> Subject: Re: Southfield termination <br /> To: Doug <ajjc@att.net> <br /> Hi Dr. Corley, <br /> Let me check on this for you and as soon as I get information on the process I'll get back to you as soon as possible. <br /> Sincerely, <br /> On Thu, Jun 10, 2021 at 7:21 AM Doug <ajjc@att.net>wrote: <br /> Zach, <br /> Prior to Energy Fuels' permit forfeiture you had instructed them to repair the rip-rap on the Magpie Diversion in your <br /> monthly inspection reports. After their permit forfeiture the repair was delayed because of the time required to get the <br /> $10,000 minimum required bond transferred to the State. After that was accomplished the responsibility for any further <br /> reclamation was left to the AML which has done nothing. It is interesting that through this process that the Diversion <br /> rip-rap repair does not seem to be important. <br /> What will be done with the $10,000 remaining bond? Will it simply go to the State? <br /> Doug Corley <br /> The Corley Company <br /> COLORADO <br /> Division of Reclamation, <br /> ca 0 Mining and Safety <br /> Department of Natural Resources <br /> Zach Trujillo <br /> Environmental Protection Specialist <br /> P 303.866.3567 x 8164 1 F 303.832.8106 1 C 303.563.9185 <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 <br /> Zach.Trujillo@state.co.us I https:Hdrms.colorado.gov/ <br /> COLORADO <br /> Division of Reclamation, <br /> 160- 0 Mining and Safety <br /> Department of Natural Resources <br /> Zach Trujillo <br /> Environmental Protection Specialist <br /> P 303.866.3567 x 8164 1 F 303.832.8106 1 C 303.563.9185 <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 <br /> Zach.Trujillo@state.co.us I https:Hdrms.colorado.gov/ <br /> https:Hmail.google.com/mail/b/ALGkdOy8elLUpphO-cw_b4dRu9Vtn4AuagOgJnHOChhDjud92irb/u/O?ik=deb7fOcd2O&view=pt&search=all&permthid=th... 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.