Laserfiche WebLink
COLORA ©O <br /> any, ,/ Division of Reclamation,ca ��3iiJl���' Mining and Safety <br /> rh+q;aarfrrp¢,�re4k asf Mantl�urar.B FYr.*u7tx�:`ati <br /> 1313 Sherman Street,Room 215 <br /> Denver,Colorado 80203 <br /> June 9,2021 <br /> Joshua Oliver <br /> Ready Mixed Concrete Company <br /> 2500 E Brannon Way <br /> Denver CO 80530 <br /> Re: Second Review of a 112 Construction Materials Reclamation Permit Amendment Application Package <br /> AM01,Nix Gravel Mine,Permit M2001-046 <br /> Mr. Oliver: <br /> The Division of Reclamation,Mining, and Safety has completed its second adequacy review of your 112 <br /> construction materials reclamation permit amendment application. The application was called complete for review <br /> on March 19,2021. All comment and review periods began on March 19,2021. The decision date for this <br /> application is June 17 2021. Please be advised that if you are unable to satisfactorily address any concerns <br /> identified in this review before the decision date, it will be your responsibility to request an extension of the <br /> review period. If there are outstanding issues that have not been adequately addressed prior to the end of <br /> the review period, and no extension has been requested, the Division will deny this application. In order to <br /> allow the Division adequate time to review your responses to any adequacy issues,please submit your <br /> adequacv responses to the Division no later than one week prior to the decision date (June 10,2021). <br /> Please note that any changes or additions to the application on file in our office must also be reflected in the <br /> public review copy, which has been placed with the Weld County Clerk and Recorder. <br /> The review consisted of comparing the application content with specific requirements of Rule 6.1,6.2, 6.4 and 6.5 <br /> of the Minerals Rules and Regulations of the Colorado Mined Land Reclamation Board for the Extraction of <br /> Construction Materials. As with most applications, there are items that will require clarification of the existing <br /> information. Any remaining inadequacies are identified under the respective exhibit heading. <br /> EXHIBIT C- Pre-mining and Mining Plan Maps) of Affected Lands (Rule 6.4.3): <br /> • The projected volumes and locations of the topsoil stockpiles need to be identified on the mining plan <br /> maps. Stating that they will be located"adjacent to"the overburden stockpiles is insufficient. The rule <br /> requires that topsoil be segregated from overburden and maintained for reclamation. What are the <br /> projected volumes of the overburden piles currently shown on the mining plan map? <br /> • There is a"batch plant"location shown on the Mining Plan map as a box, however no additional details <br /> are given either on the map or within the revised mining plan. If a concrete or asphalt batch plant is going <br /> to be located at this site, specific configuration information, not just a general location, will need to be <br /> provided on the map and within the mining plan, and the reclamation bond will need to account for the <br /> full removal of the batch plant at the end of mining. <br /> b C(V <br /> 1313 Sherman Street, Room 215, Denver, CO 8020.3 P 30 .8663567 IF'303.832.8106 http://drms.cotorado.gov ���' �� � gip, <br /> r� <br /> Jared IPoUs, Governor I flan Gibbs, Executive Director I Virginia (Brannon, Director �' � <br />