My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-03_PERMIT FILE - M2021021
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021021
>
2021-06-03_PERMIT FILE - M2021021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2025 6:01:42 AM
Creation date
6/9/2021 6:33:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021021
IBM Index Class Name
PERMIT FILE
Doc Date
6/3/2021
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISTURBANCE SUMMARY NOTES. —�� �� E <br /> 0 <br /> 1. DIISMG WETLANDS' AND THE MILWATER 0IMNEL WILL NOT BE DIMR ED. Graphic S Ca I e �r u <br /> 1.1. GARFIELD COUNTY LAND USE REGULATION 7-203 (A) REQUIRES A 35—FT SETBACK FROM / O C <br /> THE TYPICAL AND ORDINARY HIGH WATER MARK OF WATERBODIES, WHICH INCLUDES / / 0 250 500 loon -0 .E <br /> WETLANDS. THE SAME BUFFER IS APPLIED TO THE TAILWATER CHANNEL. \ N 00 U) <br /> 2. MINING OPERATIONS WILL PROCEED AS FOLLOWS: U 3 <br /> SITE PREP & DEWATERING --> MINING STAGE 1 --> MINING STAGE 2 --> RECLAMATION - COLOR4D0 In Feet 1"=500' 0)U 3 <br /> �. —� N i� <br /> LIMITS OF DISTURBED AREA aow TABLE RIVER s <br /> MINING OPERATION STAGE FLOODPLAIN (AC) OTHER (AC) STAGE TOTAL (AC) x a0 <br /> DEWATERING PIPELINE 0.81 0.15 0.96 c 7n i n O <br /> STAGE 1 1.10 16.94 18.04* <br /> 5.77 <br /> STAGE 2 ----------- -------------2.93--------8.70- O 't <br /> 01 <br /> TOTALS 7.68 20.02 27.70 3 O <br /> *STAGE 1 LDA INCLUDES 1.60 ACRES OF OPERATIONS PAD AREA I / r UD U <br /> EARTHMOVING ESTIMATE FOR KEY FEATURES PROP. DEWATERING PIPELINE INSTALLED <br /> SEE <br /> FEATURE AREA (AC) VOLUME (CYJ DURING S/TE PREP/DEWATERING STAGE <br /> 4 29,105 SHEET C3 FOR DEWATERING SITE PLAN <br /> STAGE 1 TOPSOIL 18.0 (� <br /> STAGE 1 BERMS 18.2. 0 10,719 DISTURBANCE FOR DEWATERING WILL BE <br /> A STAGE 1 MINE CUT 173 383952 TEMPORARY IN NATURE <br /> 3. <br /> U <br /> STAGE 2 TOPSOIL 8.70 14,036 / <br /> m STAGE 2 BERMS 1.47 6,006 <br /> STAGE 2 MINE CUT 6.96 188,091 ~ <br /> 1110 <br /> N \ 11 z <br /> NFL00DWAY (7YP) �f° 3�61 0v�o , N'? q <br /> SCOTT CONTRACTING ,� / ` �R 5�� �� IJ <br /> �IJ o �°' <br /> PROPERTY BOUNDARY o RO �IE — U <br /> O <br /> a 100-YR FZOODPLA/N (TYP) DEWATERING PIPELINE FLOODPLA/N 'I O U) <br /> DISTURBANCE (HATCH) <br /> EX. TAILWATER CHANNEL AND 35-FT m <br /> BUFFER SHALL NOT BE DISTURBED �- SHIDELEROSA LLLP <br /> FZOODPLA/N DISTURBANCE (HATCH) y o PROPERTY BOUNDARY (TYP) o o o <br /> cn JPOR770N OF STAGE 2 TOTAL O PARCEL NO 217908100527 <br /> J N U) <br /> J E <br /> O <br /> Q, 4 11 <br /> =`�a STAGE 2 I E16 <br /> o az � � a (D <br /> o <br /> i o <br /> i (>) <br /> c I FLOODPLA/N D/STURBANC (HATCH) c <br /> POR77ON OF STAGE 1 OTAL <br /> c <br /> � h y � a <br /> EX. WETLAND AREAS (HATCH) AND a o 4 o a o <br /> �+ 35-FT BUFFER ZONE (DASHED LINE) STAGE 1 a h c <br /> ' TOTAL LIMITS OF DISTURBED <br /> U <br /> 1 AREA (LDA) "' a 2 <br /> a <br /> w _ r <br /> Job No. 2019-341.002 <br /> Drawn by: RPF <br /> II Date: 03.29.2021 <br /> ^I / OC: ABF PE: RPF <br /> rn <br /> File: <br /> RiflePit-SitePlan <br /> Title: <br /> N __ �y:��pO•�•`'y, Disturbance <br /> y F <br /> :p 5 , Summary Plan <br /> a OPERA7ONS PAD AREA •. Dwg No. <br /> 1.60 ACRES W17HIN STAGE 1 <br /> Marc 021 f <br /> h <br /> Of: 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.