My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-03_PERMIT FILE - M2021021
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021021
>
2021-06-03_PERMIT FILE - M2021021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2025 6:01:42 AM
Creation date
6/9/2021 6:33:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021021
IBM Index Class Name
PERMIT FILE
Doc Date
6/3/2021
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit #1 June 2021 <br /> leaving the work area. Prior to bond release, Scott will conduct a noxious weed inventory <br /> and bond release reports developed by third parties for submittal to DRMS and Garfield <br /> County. Scott will include a timetable for Russian-olive and tamarisk removal for non- <br /> reclaimed areas as part of their Weed Management Plan, if needed. <br /> 6.6 Reclamation Plan Schedule <br /> The reclamation seeding plans will occur by mining phase and comply with the County and <br /> CDOT standards for application rates. <br /> See Section 6.3 for a discussion of the temporary and long-term seeding and revegetation <br /> plans. See Section 6.4 for a discussion of how the success of the revegetation plans will be <br /> monitored. See Section 6.5 for a discussion of how noxious weeds will be controlled. <br /> 6.6.1 Previously Disturbed/Unnecessary Areas <br /> Reclamation of unnecessary mine components (e.g., previously used areas which no longer <br /> will provide productive aggregate extraction) will be reclaimed in the first year from receipt of <br /> permit. This process is anticipated to take a year for grading and topsoil redistribution, and <br /> several years for appropriate reclamation species establishment and weed control. These <br /> areas are not anticipated to exceed 2 acres. <br /> 6.6.2 Active Mining Areas <br /> Reclamation of the southeast portion will occur immediately upon cessation of material <br /> extraction. Given these areas may be active for several months, reclamation may not begin <br /> for quite some time. Reclamation of these areas may take up to a year for regrading, <br /> contouring and reseeding, and multiple years after that to establish reclamation species and <br /> control noxious weeds. <br /> 6.7 Monitoring Reclamation Success <br /> Continued monitoring of the reclamation will ensure its success. The operator used local <br /> NRCS office and Garfield County input to determine the capacity of the reclaimed land to <br /> control erosion. If minor changes or modifications are needed to the seeding and <br /> reclamation plan, revision plans will be submitted to the Division. Information on all disturbed <br /> and reclaimed areas, as well as any other important items regarding the reclamation, will be <br /> submitted in the annual reports to the Division, Garfield County and Colorado Parks and <br /> Wildlife (CPW), who will also be consulted on the progress of reclamation. <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.