My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-03_PERMIT FILE - M2021021
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021021
>
2021-06-03_PERMIT FILE - M2021021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2025 6:01:42 AM
Creation date
6/9/2021 6:33:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021021
IBM Index Class Name
PERMIT FILE
Doc Date
6/3/2021
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Email Name
ACY
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit #1 June 2021 <br /> 5.2.2.3 Schedule of Operations <br /> The Rifle Gravel Pit will operate from 7 am to 7 pm Monday through Friday, and weekends, <br /> as needed. Scott will limit winter operation hours between the hours of 7 a.m. and 5 p.m. <br /> Approximately 3 to 5 employees will be on site during this phase of the mining operations. <br /> No nighttime activities are anticipated. Occasional equipment repair, or maintenance may <br /> be conducted at night, but lighting will be kept to a minimum and directed inward; the site <br /> will not have ambient lighting. <br /> i <br /> i <br /> I <br /> r <br /> t�IrM �II <br /> O Dcvrate •rj We;[Acts v our,rgstate:Mrn:nt <br /> f-.timatod Drawdov. of Groundwater lavals Following I Year of Continuous Dawatering-9%Malls at lcfslwali <br /> Figure 12. Estimated Drawdown of Groundwater Levels Following 1 year of Continuous <br /> Dewatering (estimated 3 wells). <br /> 5.2.2.4 Explosives <br /> Explosives will not be used during mining or reclamation of the property. <br /> 5.2.3 Mining Extraction (Phase 3—in 2 Stages) <br /> Initial mining extraction operations will take place in 2 extraction stages and include the <br /> areas east of the delineated wetlands. Fencing will be installed at least 10-feet away from <br /> the tailwater channel and wetlands to prevent disturbance of these resources. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.