Laserfiche WebLink
Rifle Gravel Pit #1 June 2021 <br /> 4.5 US Fish &Wildlife Consultation (USFWS)— Flowering Plants 10 <br /> 4.5.1 Debeque phacelia 10 <br /> 4.5.2 Ute ladies'-tresses 11 <br /> 5.0 Exhibit D—Mining Plan 16 <br /> 5.1 Project Location and Information 16 <br /> 5.2 Mine Facilities and Operation 16 <br /> 5.2.1 Site Development and Grading(Phase 1) 16 <br /> 5.2.1.1 Roads 16 <br /> 5.2.1.2 Topsoil and Overburden Handling 16 <br /> 5.2.1.3 Water Handling and Dewatering 17 <br /> 5.2.2 Mining Preparation (Phase 2) 21 <br /> 5.2.2.1 Topsoil and Overburden Handling 21 <br /> 5.2.2.2 Water Handling and Dewatering 21 <br /> 5.2.2.3 Schedule of Operations 22 <br /> 5.2.2.4 Explosives 22 <br /> 5.2.3 Mining Extraction(Phase 3—in 2 Stages) 22 <br /> 5.2.3.1 Stockpiling and Overburden Handling 23 <br /> 5.2.3.2 Water Handling and Dewatering 23 <br /> 5.2.3.3 Schedule of Operations 23 <br /> 5.2.4 Reclamation(Phase 4) 23 <br /> 5.3 Mining Timetable 24 <br /> 6.0 Exhibit E—Reclamation Plan 25 <br /> 6.1 Description and Types of Reclamation 25 <br /> 6.2 Post-Mining Land Use 25 <br /> 6.3 Implementation of the Reclamation Plan 25 <br /> 6.3.1 Topsoil Segregation. Preservation, and Replacement 25 <br /> 6.3.2 Final Grading 26 <br /> 6.3.3 Seeding 26 <br /> 6.3.3.1 Temporary Seed Mix 26 <br /> 6.3.3.2 Long-Term/Permanent Seed Mix 26 <br /> 6.3.4 Fertilization 29 <br /> 6.3.5 Revegetation 29 <br /> 6.3.6 Topsoiling 29 <br /> 6.4 Revegetation Success Criteria 29 <br /> 6.5 Noxious Weed Control 29 <br /> 6.6 Reclamation Plan Schedule 30 <br /> 6.6.1 Previously Disturbed/Unnecessary Areas 30 <br /> 6.6.2 Active Mining Areas 30 <br /> 6.7 Monitoring Reclamation Success 30 <br /> 7.0 Exhibit F—Reclamation Plan Map 31 <br /> ii <br />