My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-03_PERMIT FILE - M2013006
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013006
>
2021-06-03_PERMIT FILE - M2013006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 2:17:37 AM
Creation date
6/7/2021 6:48:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013006
IBM Index Class Name
PERMIT FILE
Doc Date
6/3/2021
Doc Name
Request for Conversion of Permit
From
Bower Bros. Construction
To
DRMS
Type & Sequence
CN1
Email Name
CCW
JDM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bower Brothers Construction <br /> "Taylor Pit" <br /> Exhibit"E" <br /> Reclamation Plan <br /> A) Reclamation will be done immediately following the removal of limestone <br /> deposits. Pit edges will be graded to 3:1 slopes and will be shaped to promote <br /> wildlife habitat. Reclaimed land will be covered with 6-10 inches of topsoil and <br /> reseeded. Pit edges will be replaced with a loader and shaped with an excavator or <br /> dozer. <br /> B) Post mining uses will be wildlife habitat and livestock grazing. Other land uses in <br /> the area are livestock grazing. <br /> C) Reclamation plan will be implemented at the extraction of limestone deposits. <br /> Phase I to be mined over the summer of 2021 -2051. Reclamation of Phase 1 to <br /> take place immediately following removal of limestone deposits. After placing <br /> and shaping of reclaimed land, 6-10 inches of topsoil will be spread across <br /> reclaimed surfaces and will be seeded as follows per soil conservation office. <br /> D) N/A <br /> E) i Affected land to be reclaimed by the summer 2051. <br /> ii Phase I - 15 acres <br /> iii 1 overburden placement and slope rebuilding. <br /> 2 berm and edge pit shaping <br /> 3 topsoil placement <br /> 4 reseeding <br /> F) i Slopes to be graded to 3:1 <br /> ii 1 Sainfoin—2.5 lbs/acre <br /> 2 Bromine Smooth— 1.6 lbs/acre <br /> 3 Intermediate Wheatgrass—2.51bs/acre <br /> 4 Pubescent Wheatgrass—2.251bs/acre <br /> 5 Orchard—0.3 lbs/acre <br /> iii N/A <br /> iv N/A <br /> v 6-10 inches of topsoil to be replaced on affected areas. <br />
The URL can be used to link to this page
Your browser does not support the video tag.