My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-02_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2021-06-02_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2021 1:20:53 PM
Creation date
6/3/2021 1:20:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
6/2/2021
Doc Name Note
For SL12
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Mountain Coal Company
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total 1 121.44 1 $1,125,369.22 1 67.60 1 $196,037.00 1 61.55 1 $135,048.00 <br /> Prior to the SL-12 application the total disturbed acreage(TDA) at the West Elk Mine was 562.23 acres, <br /> and the required surety(RS)was$12,276,561. Rule 3.03.1(2) allows for the release of up to 60% of the <br /> applicable bond at Phase I,25% at Phase H and the remaining 15% at Phase III,the calculation below <br /> shows the maximum dollar amount eligible for release with the approval of SL-12 (X): <br /> SL12 acres <br /> X TDA x RS x 0.6 <br /> 22.58 <br /> X = x $12,276,561 x 0.6 <br /> 562.23 <br /> X = $295,827.06 <br /> Table 3 <br /> Maximum Bond Eligible For Release per Rule 3.03.1(2) <br /> Prior to SL-12 Prior to SL-12 SL-12 Eligible for release <br /> (Acres) (Required Surety) (Acres) with SL-12 <br /> Phase I-600o $7,365,936.60 22.58 $295,827.06 <br /> Phase 11-25% $3,069,140.25 0.00 $0.00 <br /> Phase III- 15% $1,841,484.15 0.00 $0.00 <br /> Total 562.23 $12,276,561.00 $295,827.06 <br /> In the site-wide reclamation cost estimate(RCE)recently completed with the approval of Permit <br /> Renewal 07 (RN-07)the reclamation of sites included in the SL-12 application is accounted for in tasks <br /> 419a, 419b,439a,439b,440a,440b, and 441a(which also includes sites that are not addressed with SL- <br /> 12);these tasks will need to be reconciled when the next site-wide RCE is calculated. The total of the <br /> estimated direct costs associated with these tasks (Y)is$319,085, as shown in table 4. <br /> Table 4 <br /> RN7 Cost Estimate Task Task Description Task Direct <br /> Number Cost <br /> 419a 35 MVBs/Exp in SL-121: plug and seal $122,037 <br /> 419b 35 MVBs/Exp in SL-12: regrade $114,092 <br /> 439a 5 Exploration holes, MR423: plug and seal $30,011 <br /> 439b 5 Exploration holes, MR423: regrade $7,141 <br /> 440a 3 Exploration holes, MR424: plug and seal $18,004 <br /> 440b 3 Exploration holes, MR424: regrade $5,878 <br /> 441a 33 Monitoring wells: plug and seal $80,380 <br /> Task 441a pro-rated for 9 holes $21,922 <br /> Total applicable to SL-12 $319,085 <br /> C-1980-007 Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.