My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-02_GENERAL DOCUMENTS - C1980007
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980007
>
2021-06-02_GENERAL DOCUMENTS - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2021 1:20:53 PM
Creation date
6/3/2021 1:20:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
6/2/2021
Doc Name Note
For SL12
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Mountain Coal Company
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. PROCEDURES AND SUMMARY OF THE REVIEW PROCESS <br /> Mountain Coal Company, LLC applied for Partial Phase I Bond Release under the Colorado Surface <br /> Coal Mining and Reclamation Act following reclamation of a portion of the West Elk Mine. The mine <br /> is located in Delta and Gunnison Counties. The mine permit area is located in: Portions of Sections 9 <br /> through 36 (inclusive),Township 13 South, Range 90 West; Portions of Sections 23 through 26 <br /> (inclusive),Township 13 South,Range 91 West; Portions of Sections 1 through 5, 8 through 12, 14 <br /> through 16, and 21 through 23,Township 14 South, Range 90 West; all of the 6th P.M. <br /> Summary of Previous Bond Releases <br /> Partial Phase I Bond Release SL-01 was received on July 19,2004 and requested a release of <br /> 15.19 acres for the thermal event disturbance area. The Division approved the Partial Phase I <br /> Bond Release SL-01 on October 14, 2005 and released$79,727.00 <br /> Partial Phase I Bond Release SL-02 was received on July 26,2004 and requested a release of 5.5 <br /> acres for the Lone Pine Gulch facilities area. The Division approved the Partial Phase I Bond <br /> Release SL-02 on November 2,2005 and released$122,629.00 <br /> Partial Phase I Bond Release SL-03 was received on May 16,2011 and requested a release of <br /> 47.65 acres. The release included the plugging and abandonment of 74 drill holes,the <br /> backfilling and regrading of 48 drill pads and the backfilling and regrading of approximately 8.5 <br /> miles of roads. The Division issued its proposed decision to approve the Partial Phase I Bond <br /> Release SL-03 on August 10, 2012 and released$470,488.00 <br /> Partial Phase II Bond Release SL-04 was received on October 3,2013 and requested a release of <br /> 67.6 acres. The release included the replacement of topsoil and revegetation to control erosion to <br /> pre-mining levels on vent shafts, drill pads and their associated light-use roads. The Division <br /> issued its proposed decision to approve the Partial Phase II Bond Release SL-04 on July 8,2013 <br /> and released$196,037.00 <br /> Partial Phase I Bond Release SL-05 was received on February 22, 2013 and requested a release <br /> of 13.85 acres. The release included the plugging and abandonment of 24 drill holes,the <br /> backfilling and regrading of 17 drill pads and the backfilling and regrading of approximately 2.1 <br /> miles of roads. The Division issued its proposed decision to approve the Partial Phase I Bond <br /> Release SL-05 on February 11,2014 and released$94,475.00 <br /> Partial Phase III Bond Release SL-06 was received on December 3, 2013 and requested the final <br /> bond release of 24.2 acres. The release included the Lone Pine area,the thermal event area and <br /> the West Point area. The Division issued its proposed decision to approve the Partial Phase III <br /> Bond Release SL-06 on June 12,2015 and released$69,761.00 <br /> Partial Phase I Bond Release SL-07 was received on May 1,2014 and requested a release of <br /> 19.23 acres. The release included the plugging and abandonment of 22 drill holes,the <br /> backfilling and regrading of 22 drill pads and the backfilling and regrading of the associated <br /> light-use roads and road spurs. The release also included the Partial Phase I Release of the <br /> C-1980-007 Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.