<br /> a different affidavit or dedication process is necessary to assure proper dedication of the
<br /> shares, additional information may be required prior to future SWSP approvals.
<br /> 9. All diversions shall be measured in a manner acceptable to the division engineer. The
<br /> Applicant shall install and have approved by the Water Commissioner all structures prior to
<br /> any credit or use in this SWSP. The Applicant shall maintain such measuring devices as
<br /> required by the division engineer for operation of this SWSP. In addition, the applicant shall
<br /> maintain daily records of all diversions, replacements, and the amount of water used for each
<br /> particular purpose. The applicant shall provide a report of these records to the division
<br /> engineer and the water commissioner on a monthly basis, or more frequent as required, on a
<br /> form approved by them. The accounting must be submitted to the division engineer in
<br /> Greeley (IDINIR I rvlAccouirntnn state.co.us) and the water commissioners [Jorge Vidal
<br /> (�oir e.Vldalstate.co,us), Mark Simpson (Mairk.Slm son6�state.co.us), Shera Sumerford
<br /> (51hneira.Suirmneirfoird 9)state.co.us), Lauren Berrien (,La.uiremirn.Beirid'i state.co.u.us), and Brent
<br /> Schantz (.13irein-L.Sclhaintz@s-ta-te.co.us)] within 30 calendar days of the end of the month for
<br /> which the accounting is being made. Submitted accounting shall conform to the attached
<br /> Division One Administration Protocol "Augmentation Plan Accounting".
<br /> In addition, the applicant shall verify that each entity making replacements for this plan,
<br /> have included this plan in their respective accounting submitted to the division engineer. For
<br /> this plan period those entities are the City of Longmont, Centennial Water and Sanitation
<br /> District, City of Westminster, and City of Thornton.
<br /> 10. All return structures utilized in this plan must have a measuring device equipped with an
<br /> electronic recording device and must be approved by the water commissioner prior to use. In
<br /> addition, all charts or other output data associated with each measuring device utilized in this
<br /> plan must be provided in a timely manner acceptable to all of the water commissioners
<br /> identified herein.
<br /> 11. The Applicant shall be required to notify and obtain approval of the Water Commissioners in
<br /> writing a minimum of 48 hours, or as required by each individual Water Commissioner, of all
<br /> planned releases and exchanges, including but not limited to, location, amount, and timing
<br /> (start and end dates). In addition, the Applicant will coordinate deliveries of changed shares
<br /> back to the river from the Whitney Ditch, the Fulton Ditch, the Brighton Ditch, and the
<br /> Greeley Irrigation Canal with the Water Commissioners. Aggregate will track and provide the
<br /> amount of water available, the amount of water requested, and the amount of water
<br /> delivered on a daily basis or as required by the water commissioner.
<br /> 12. The Division Engineer, or his designated representative, will administer all such water
<br /> transported in the South Platte River or its tributaries under this SWSP, including water for
<br /> replacement of depletions, past intervening headgates to ensure that such water is not
<br /> intercepted or otherwise diminished in quantity by diversion, use or other interference by
<br /> intervening water rights and to assure that such water remains available and suitable for
<br /> Applicant's uses under this SWSP, except when any intervening headgate is diverting the
<br /> entire flow of ("sweeping") the river. In the event that delivery past headgates which sweep
<br /> the river requires the installation of a bypass structure or the use of an existing bypass
<br /> structure by agreement with a third-party, Applicant is responsible for either installing a new
<br /> bypass structure with a continuous recording measuring device(s) as approved by the Water
<br /> Commissioner or securing an agreement with a third-party to use an existing bypass structure
<br /> and providing such information and agreement to the Division Engineer.