Aggregate Industries South Platte Combined SWSP June 1, 2021 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, 8t 6090 Page 17 of 23 <br /> In accordance with approach no. 4, you have provided an affidavit dated February 29, 2012, <br /> that dedicates the 13.5 shares of the Whitney Ditch Company and 96 shares of the Fulton Irrigating <br /> Ditch Company described above as replacement water solely for this combined SWSP for as long as <br /> there are depletions at these gravel pit sites or until such time as another replacement source is <br /> obtained. This dedication supersedes a previous dedication dated January 25, 2011. A copy of the <br /> affidavit is attached to this letter. You have also provided an affidavit dated April 23, 2019 that <br /> dedicates 5/12th5 of the Zweck &t Turner Ditch described above as replacement water solely for the <br /> Fredstrom Pit for as long as there are depletions at the gravel pit site or until such time as another <br /> replacement source is obtained. For the purposes of this SWSP, these affidavits will be accepted for <br /> the dedication of the shares; however, if the State Engineer determines that a different affidavit or <br /> dedication process is necessary to assure proper dedication of the shares, additional information may <br /> be required prior to future SWSP approvals. A summary of the final reclamation and the approach <br /> for compliance with the DRMS letter, including the current posted bond amount, is shown in Table E. <br /> Table E - Final Reclamation Summary <br /> Site Name Proposed Final Bond DRMS Comments <br /> Reclamation Amount Approach No. <br /> Backfilling of all post-81 areas in progress. <br /> Jeronimus Pit Backfilled $1,510,800 1, 4 Water rights dedicated via February 29, 2012 <br /> affidavit. <br /> Hazeltine Pit Lined Reservoir $670,602 3 Bonded for lining. The site has been lined with a <br /> slurry wall (WDID 0203381). <br /> Bonded for lining. The south and central <br /> reservoirs are lined with a slurry wall (WDID <br /> 0203385) and have obtained SEO liner approval. <br /> Lined A bond reduction was approved by DRMS. The <br /> Brighton Pit Reservoir/Lakes $1501000 1, 3 applicant is in the process of backfilling the <br /> remaining exposed groundwater areas. Once <br /> backfilling is complete, additional SWSPs will be <br /> required until the applicant has replaced all of <br /> the remaining tagged depletions. <br /> Tucson South Pit Lined Reservoir $3,505,000 1, 3 Bond increased with the acceptance of <br /> Amendment 1 which increased permit area. <br /> Wattenberg Pit Lined Reservoir $520,000 3 Bonded for lining. (Pit lined in 2013; however, <br /> liner has not yet been tested or approved.) <br /> Platte Valley Pit Groundwater Lake $754,732 1, 4 Bonded for backfilling. Water rights dedicated <br /> via February 29 2012 affidavit. <br /> Bonded for backfilling. Lagged and future <br /> depletions from evaporation and consumptive <br /> Distel Pit Groundwater Lake $1,216,716 1, 2 use by wetlands vegetation at the site covered <br /> under City of Longmont augmentation plan <br /> decreed in case no. 2009CW271. <br /> Tull Pit Lined Reservoir $2,947,600 1, 3 Bonded for lining. Conditional water storage <br /> right decreed in case no. 1994CW062. <br /> Irwin-Thomas Pit Lined Reservoir $2,747,911 3 Bonded for lining. <br /> Fredstrom Pit To Be Determined $1,000 4 <br /> Water rights have been dedicated via April 23, <br /> 2019 affidavit. <br /> Conditional water storage right and plan for <br /> W.W. Farms Pit Lined Reservoir/ $270 000 2 augmentation for evaporation from up to 66 <br /> Groundwater Lakes acres of water surface area decreed in case no. <br /> 1990CW23 site currently exposes 36 acres . <br /> F-Street Pit Groundwater Lake $10,237,994 1 or 3 Bond amount increased to cover the cost of <br /> backfilling the site. <br />