Laserfiche WebLink
Aggregate Industries South Platte Combined SWSP June 1, 2021 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, 8t 6090 Page 3 of 23 <br /> Hazeltine Pit Status: Resource extraction at the Hazeltine Pit has been completed and <br /> (South Platte reclamation is in progress. The Hazeltine Pit was lined with a soil bentonite <br /> Mainstem) slurry wall, and was approved as having been lined to the design standard <br /> referenced in the August 1999 State Engineer Guidelines for Lining Criteria for <br /> Gravel Pits in a letter dated May 25, 2016. The construction of the slurry wall <br /> resulted in groundwater mounding and flooding of adjacent property. The <br /> operator has installed a gravity drain to dewater the site on a continuous basis. <br /> A 45-day leak test was performed after installation of the permanent drain to <br /> verify that the liner was not impacted. The liner was re-approved in a letter <br /> dated March 22, 2018. Depletions covered by this SWSP are limited to lagged <br /> depletions from past operations at the site, including past dewatering. <br /> Exposed Groundwater Surface: None <br /> Active Dewatering: No <br /> Brighton Pit Status: Resource extraction at the Brighton Pit is complete and reclamation is in <br /> (South Platte progress. Depletions covered by this SWSP include water lost due to evaporation <br /> Mainstem) and post-pumping dewatering depletions. The south and central reservoirs are <br /> lined with a slurry wall (WDIDs 0203031 and 0203385) and have obtained SEO <br /> liner approval. Reclamation work includes backfilling the remaining exposed <br /> areas, of which 2 acres was backfilled in 2020. Mining operations will not be <br /> considered to have ceased until the backfilling is complete. <br /> Exposed Groundwater Surface: 1.0 acres <br /> Active Dewatering: No <br /> Tucson South Status: Aggregate intends to continue actively mining the Tucson South Pit <br /> Pit during 2021. Depletions covered by this SWSP include water lost due to <br /> (South Platte evaporation, aggregate production, and dust control. <br /> Mainstem) Exposed Groundwater Surface: 10.0 acres (including 2.0 acres transferred from <br /> the Tucson Pit) <br /> Active Dewatering: Proposed to start in 2021 <br /> Wottenberq Pit Status: Resource extraction at the Wattenberg Pit is complete and reclamation <br /> (South Platte is in progress. Depletions covered by this SWSP include water lost due to <br /> Mainstem) evaporation, dust control, and dewatering. Prior to 2018, the north pit was <br /> dewatered with water delivered to the nearby Broda Pond. The north cell has <br /> since been lined, and dewatering operations have shifted to the south cell with <br /> water to be discharged to multiple locations. A portion of the water will be <br /> pumped to the Stillwater Ski Lake located south of the pit to mitigate lower <br /> levels in the pond due to the suppressed water table resulting from dewatering. <br /> A portion of the water may be pumped to a new recharge pond on the west side <br /> of the site in order to mitigate low water table levels in domestic wells in the <br /> area. A portion of the water may be discharged to the Huett Seep, a surface <br /> drainage adjacent to the site. The remainder of the dewatering discharge will be <br /> pumped across the South Platte River to the Broda Pond located within the <br /> Platte Valley Pit. Once water enters the Broda Pond, some is pumped to the <br /> river to ensure the pond does not spill. There was a temporary cessation of <br /> dewatering in January 2018. The site will be dewatered continuously throughout <br /> 2021. <br /> Exposed Groundwater Surface: 37.0 acres <br /> Active Dewatering: Yes <br />