My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-01_HYDROLOGY - M1977436
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977436
>
2021-06-01_HYDROLOGY - M1977436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 7:36:04 AM
Creation date
6/3/2021 7:27:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977436
IBM Index Class Name
Hydrology
Doc Date
6/1/2021
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aggregate Industries South Platte Combined SWSP June 1, 2021 <br /> Plan IDs 3614, 4773, 3624, 4772, 4616, 3437, 3376, 3650, 3668, 5475, 5829, 8t 6090 Page 10 of 23 <br /> be made to St. Vrain Creek during the period of April through October 2021 pursuant to the attached <br /> delivery schedule. <br /> South Platte Mainstem <br /> Projected <br /> Replacement Sources 2021 Yield Comments <br /> acre-feet) <br /> Centennial 30.00 Perpetual lease <br /> Westminster 1998 265.24 Available throughout the year-perpetual lease; <br /> 265.24 acre-feet proposed to be used in 2021 <br /> Westminster Annual Lease 184.00 Annual lease with Westminster <br /> Thornton Effluent 10.53 November- March only <br /> Fulton Ditch 96.28 96 shares total; 62 to be used in 2021 <br /> Brighton Ditch 203.79 1.038 shares total <br /> Note: Projected 2021 yields may vary from previous estimates of the net yield due to the computed return flow <br /> obligations based on the previous year's actual water deliveries. <br /> Centennial Lease <br /> Aggregate conveyed water rights in exchange for a perpetual lease of augmentation water in <br /> an agreement with Centennial Water and Sanitation District in 1996. The agreement requires <br /> Centennial to provide Aggregate with 30 acre-feet of fully consumable water each year. The rate of <br /> delivery for the 30 acre-feet cannot exceed 0.5 cfs, but can be taken at any time throughout the <br /> year. For this plan period, Aggregate intends to utilize this source during the months of April and <br /> October. A copy of a letter confirming Centennial's intent to follow the proposed schedule dated <br /> December 30, 2020 is attached. Aggregate will not claim credit from Centennial releases on days <br /> when the Burlington Ditch is sweeping the river. The Applicant is working on ways to bypass the <br /> Centennial credits past the Burlington Ditch for future SWSP approvals. <br /> Westminster 1998 Lease <br /> The 1998 effluent lease with the City of Westminster is a perpetual lease that provides 0.28 <br /> cfs of fully consumable water every day of each year (averaging 16.89 acre-feet per month) and an <br /> additional 0.17 cfs every day from October 1 to June 30 during each year (averaging 10.25 acre-feet <br /> per month) at the outfall of the Metro Wastewater Treatment Plant. The lease provides 294.79 <br /> acre-feet annually, of which 265.24 acre-feet are anticipated to be utilized in this SWSP. (The <br /> remaining 29.55 acre-feet are reserved for use in case no. 2007CW198.) <br /> Westminster Annual Lease <br /> Pursuant to a March 4, 2010 Consumable Water Lease Agreement with the City of Westminster <br /> (amended January 14, 2020), Aggregate may lease up to 250 acre-feet of consumable water annually, <br /> with a minimum lease of 150 acre-feet per year unless changed by mutual agreement between the <br /> parties. The amended lease is valid through June 30, 2022. Deliveries under this lease are available <br /> from November 101h through March 201h from either the Metro Wastewater Treatment Plant or the Big <br /> Dry Creek Wastewater Treatment Plant. For 2021, Aggregate and Westminster have agreed to a <br /> total annual delivery amount of 184 acre-feet. A copy of the proposed 2021 delivery schedule, dated <br /> January 4, 2021, is attached. For this SWSP, transit losses were assessed assuming deliveries will be <br /> from the Big Dry Creek Wastewater Treatment Plant. Notice must be provided and approval made by <br /> the water commissioner at least 48 hours prior to the release of replacement water, or as required <br /> by the water commissioner, and must identify which source the replacement water will originate <br /> from (the Metro Wastewater Treatment Plant or the Big Dry Creek Wastewater Treatment Plant) to <br /> allow confirmation of release and that water was delivered. <br />
The URL can be used to link to this page
Your browser does not support the video tag.