Laserfiche WebLink
Kiowa County <br /> Page 4of5 <br /> June 2021 <br /> Exhibit F—Reclamation Plan Map <br /> 1 S. The Reclamation Plan Map has the incorrect permit number(should be M-2021-015 not M- <br /> 2020-015). <br /> 19. Please check the scale on this map and make revisions as necessary. See Item 3 above <br /> 20. There appears to be a discrepancy with the name of a landowner on the map. See Item 4 <br /> above. <br /> Exhibit G—Water Information (Rule 6.4.7) <br /> 21. Please provide a statement that stormwater runoff detained by the 10-foot low area created by <br /> the topography after reclamation (southwest corner of site) will likely infiltrate in <br /> approximately two days, and that it is not likely that runoff detention will hinder downstream <br /> water users. (Pursuant to Rules 3.1.6(1) and 6.3.30).) <br /> 22. Pease provide more detail on the water diversion structures. This includes the height of the <br /> berm and how it was determined that the height will be sufficient to adequately control the <br /> runoff. <br /> 23. Please provide the estimated depth to groundwater in the area of the proposed mine (and <br /> include the source of information), and compare this depth to the mining depth. (Pursuant to <br /> Rule 6.4.7(1).) <br /> 24. Please state that an NPDES permit has or has not been applied for. If not, is this due to the <br /> lack of discharge or based on a finding of the Water Quality Control Division? (Pursuant to <br /> Rule 6.4.7(5).) <br /> Exhibit S—Permanent Man-made Structures (Rule 6.4.19) <br /> 25. For each applicable owner, a structure agreement must be written and notarized for the road <br /> and fences. Where such an agreement cannot be reached, the applicant shall provide an <br /> appropriate engineering evaluation that demonstrates that such structure shall not be <br /> damaged by activities occurring at the mining operation. (Pursuant to Rule 6.4.19.) <br /> This concludes the Division's preliminary adequacy review. Please ensure the Division has <br /> sufficient time to complete its review process by responding to these adequacy items no later <br /> than one week prior to the decision date. If additional time is needed to respond, you must <br /> submit an extension request to our office prior to the decision date. <br />