Laserfiche WebLink
Kiowa County <br /> Page 2 of 5 <br /> June 2021 <br /> c. All maps illustrating the extent of the permit area need to be revised to show the <br /> road. <br /> d. All application materials that reference the permit area value of 40 acres must be <br /> updated with the new acreage. <br /> e. The Reclamation Plan must include the reclamation of the road. Alternatively, <br /> Kiowa County can submit letters from landowners saying that they want the road <br /> to remain permanent. <br /> f. The lease agreement (which currently lists 40 acres) needs to be revised or a new <br /> one must be created to reflect the larger acreage. The revised document must be <br /> submitted to the Division. <br /> Exhibit C—Pre-MininL and Minim Plan Maus <br /> 2. The maps (Current Conditions Map and Mining Plan Map)have the incorrect permit number <br /> (should be M-2021-015 not M-2020-015). <br /> 3. Please check the scale on the two maps and make revisions as necessary. It appears that the <br /> scales may not be accurate. For example, the sides of the permit area are approximately <br /> 1,600 feet long,per the scale (which is approximately 300 feet too long). <br /> 4. On the two maps, there appears to be a discrepancy with the name of a landowner. The name <br /> "Spiller"is sometimes used, and the name "Splitter"is sometimes used. Please clarify this, <br /> and confirm that the correct name is used on the Adjacent Surface Owner Notice. <br /> Exhibit D—Minim Plan (Rule 6.4.4) <br /> 5. Please provide more detail to the Mining Plan per Rule 6.4.4. Specify the anticipated <br /> maximum dimensions of highwalls (height, length) and the grade for access ramps. Specify <br /> the minimum distance of surface disturbance from the permit boundary and explain how the <br /> mining process will avoid off-site impacts. <br /> 6. Please state the anticipated depth of mining and describe the material below the mined <br /> material. (Pursuant to Rule 6.4.4(f).) <br /> 7. Please describe the seed mix to be used to stabilize the topsoil stockpile. <br /> 8. Please specify the dimensions of the road(s)used in the mining operation as access and haul <br /> roads (Pursuant to Rule 6.4.40).) <br />