My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-02_REVISION - C1980007 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2021-06-02_REVISION - C1980007 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2021 1:20:53 PM
Creation date
6/2/2021 3:56:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
6/2/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Mountain Coal Company
Type & Sequence
SL12
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total 1 121.44 1 $1,125,369.22 1 67.60 1 $196,037.00 1 61.55 1 $135,048.00 <br /> Prior to the SL-12 application the total disturbed acreage(TDA) at the West Elk Mine was 562.23 acres, <br /> and the required surety(RS)was$12,276,561. Rule 3.03.1(2) allows for the release of up to 60% of the <br /> applicable bond at Phase I,25% at Phase H and the remaining 15% at Phase III,the calculation below <br /> shows the maximum dollar amount eligible for release with the approval of SL-12 (X): <br /> SL12 acres <br /> X TDA x RS x 0.6 <br /> 22.58 <br /> X = x $12,276,561 x 0.6 <br /> 562.23 <br /> X = $295,827.06 <br /> Table 3 <br /> Maximum Bond Eligible For Release per Rule 3.03.1(2) <br /> Prior to SL-12 Prior to SL-12 SL-12 Eligible for release <br /> (Acres) (Required Surety) (Acres) with SL-12 <br /> Phase I-600o $7,365,936.60 22.58 $295,827.06 <br /> Phase 11-25% $3,069,140.25 0.00 $0.00 <br /> Phase III- 15% $1,841,484.15 0.00 $0.00 <br /> Total 562.23 $12,276,561.00 $295,827.06 <br /> In the site-wide reclamation cost estimate(RCE)recently completed with the approval of Permit <br /> Renewal 07 (RN-07)the reclamation of sites included in the SL-12 application is accounted for in tasks <br /> 419a, 419b,439a,439b,440a,440b, and 441a(which also includes sites that are not addressed with SL- <br /> 12);these tasks will need to be reconciled when the next site-wide RCE is calculated. The total of the <br /> estimated direct costs associated with these tasks (Y)is$319,085, as shown in table 4. <br /> Table 4 <br /> RN7 Cost Estimate Task Task Description Task Direct <br /> Number Cost <br /> 419a 35 MVBs/Exp in SL-121: plug and seal $122,037 <br /> 419b 35 MVBs/Exp in SL-12: regrade $114,092 <br /> 439a 5 Exploration holes, MR423: plug and seal $30,011 <br /> 439b 5 Exploration holes, MR423: regrade $7,141 <br /> 440a 3 Exploration holes, MR424: plug and seal $18,004 <br /> 440b 3 Exploration holes, MR424: regrade $5,878 <br /> 441a 33 Monitoring wells: plug and seal $80,380 <br /> Task 441a pro-rated for 9 holes $21,922 <br /> Total applicable to SL-12 $319,085 <br /> C-1980-007 Page 9 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.