My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-06-02_REVISION - C1980007 (15)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2021-06-02_REVISION - C1980007 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2021 1:20:53 PM
Creation date
6/2/2021 3:56:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
6/2/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Mountain Coal Company
Type & Sequence
SL12
Permit Index Doc Type
Findings
Email Name
LDS
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following adequacy issues were noted: <br /> • The E6-13 pad had been included on the map but not the table submitted with the SL-12 <br /> application. It had not been reclaimed at the time of the inspection and will not be included in <br /> SL-12.An amended map was submitted by MCC. <br /> • The E5-11 and E64 holes had been plugged and abandoned,but the pads had been left open as a <br /> staging area. Since Phase I bond release requires that backfilling and grading of the disturbed <br /> area be complete,E5-11 and E64 are not eligible for bond release and will not be included in <br /> SL-12. <br /> A follow-up inspection was made on May 7,2021,to verify the plugging and abandonment of the <br /> monitoring wells(these were not marked on the map submitted with the SL-12 application and had been <br /> overlooked during the first inspection). <br /> The 17LC-01, -05, -06,and-07 exploration holes were also omitted from the June 3-5, 2019 inspection, <br /> however their successful reclamation was documented in inspection reports from September and <br /> October,2017, and in photographs sent to the Division. <br /> The final list of sites to be released from Phase I liability with SL-12 are given below in Table 1. <br /> Table 1 <br /> Phase Site Details Type Landowner Acreage Reclamation Comment <br /> /manager Date <br /> I e4-15 MVB USFS 0.54 2016 <br /> 1 e4-16 MVB USFS 0.60 2016 <br /> 1 e4-17 MVB USFS 0.63 2016 <br /> 1 101we6x62 Exploration/MVB USFS N/A N/A Drilled on existing road <br /> I e5-1 MVB USFS <br /> I e5-2 MVB USFS 1.10 2017 <br /> 1 e5-3 MVB USFS <br /> I Access road to e5-1 through-3 Road USFS 0.07 2017 <br /> 1 e5-4 MVB USFS 0.83 2017 <br /> 1 e5-5 MVB USFS 0.46 2017 <br /> 1 e5-6 MVB USFS <br /> 1 e5-7 MVB USFS 0.73 2017 <br /> I e5-8 MVB USFS 0.92 2018 <br /> 1 e5-9 MVB USFS <br /> 1 e5-10 MVB USFS 0.85 2017 <br /> I 10we5x40 Exploration/MVB USFS N/A N/A Drilled on existing road <br /> I 111we5x40 Exploration/MVB USFS <br /> I e5-12 MVB USFS 0.75 2017 <br /> 1 e5-13 MVB USFS <br /> I e5-14 MVB USFS 0.59 2017 <br /> I Access road to e5-12 through- Road USFS 1.43 2018 <br /> 14 <br /> 1 e5-15 MVB USFS 1.84 2017 <br /> 1 e5-16 MVB USFS 1.99 2017 <br /> 1 e5-17 MVB USFS 0.32 2017 <br /> 1 e5-18 MVB USFS 0.49 2017 <br /> C-1980-007 Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.