IL PROCEDURES AND SUMMARY OF THE REVIEW PROCESS <br /> Colowyo applied for a partial Phase I Bond Release for 18 acres associated with the West Pit and <br /> East Pit as shown on Map I of the SL-20 application. Of the 18 acres, 12.1 acres are being <br /> requested for Phase I Bond Release in the West Pit and 5.9 acres in the East Pit. The bond release <br /> area is located in Township 3 North, Range 93 West of the 6th Principal Meridian, Section 3 — <br /> SW 1/4 NE '/4 and SE '/4 NW '/4 and Section 4— SE '/4 NE '/4. The permit area can be found on the <br /> USGS Quadrangle 7.5 Minute Series Maps of Axial and Nine Mile Gap. The permit area and <br /> surface ownership can be found on Map 1, and the coal ownership can be found on Map 2 of the <br /> Colowyo Permit Application Package (PAP). <br /> Background <br /> The East Pit and West Pit mining sites lie just west of the northward flowing Goodspring (also <br /> referred to as Good Spring) Creek,which is paralleled by Colorado Highway 13. The area <br /> includes gently sloping uplands and valleys that cut into the upland surface. These valleys are <br /> generally narrow, v-shaped, and about 250 to 500 feet deep. Elevations range from <br /> approximately 7,650 feet in the upper portion of East Pit reclamation to 6,950 feet near East <br /> Taylor Pond. <br /> Mining operations began in 1976 with the East Pit, a multi-seam coal operation that continued to <br /> move in a southerly direction. Eight coal seams (Y,X,A, B, C, D, E, F)were mined from the <br /> East Pit,ranging in thickness from two to fifteen feet. The East Pit is nearly 6,000 feet from east <br /> to west(width), 1,000 feet in breadth (highwall to highwall), and 450 feet deep. Due to the <br /> number of coal seams, immense size of the pit, and manpower and equipment employed, pit <br /> progression was slow,with additional disturbances of approximately 40 to 50 acres per year. <br /> Extraction of coal from the East Pit was terminated in 2006. All reclamation activities have been <br /> completed in the East Pit and is in the required final revegetation stages. <br /> The West Pit is located to the west of the East Pit. The method of operation utilized in, and the <br /> coal seams extracted from, the West Pit were the same as those of the East Pit. The West Pit was <br /> roughly the same overall size as the East Pit. Mining in the West Pit advanced from the north to <br /> south, paralleling the movement of the adjacent East Pit. Mining operations in the West Pit were <br /> completed in 2015. Reclamation activities remaining in the West Pit include backfilling, <br /> grading, reduction of the highwall, and revegetation. <br /> Colowyo is continuing to perform reclamation maintenance and activities in the East Pit and <br /> West Pit. Reclamation in the East Pit and West Pit is expected to conclude in 2029. <br /> Operations in the South Taylor Pit began after the approval of PR-02 in 2007. This pit is located <br /> north and west of the northward flowing Good Spring Creek and southwest of the West Pit. It <br /> lies partially in Rio Blanco County. In the South Taylor Pit, 17 seam and sub-seam complexes <br /> are mined. The seams are the A, B, C, D, E, F and G seams and their seam complexes (for <br /> example,the G-Seam is separated into G7, G8 and G9 in the South Taylor Area). At the peak of <br /> Proposed Decision and Findings of Compliance May 28,2021 <br /> Partial Phase I Bond Release SL-20 Page 2 <br />