Laserfiche WebLink
Table 3. SL-20 Releasable Amount <br /> Task Phase I Cost <br /> Regrade Topsoil from Pile 15B(WP030) $ 3,536.00 <br /> Regrade Topsoil from Pile 15H(EP062) $ 1,724.00 <br /> Reseed 12.1 acres of West Pit with Grazing Land Seed Mix $ 6,826.00 <br /> Reseed 5.9 acres of East Pit with Grazing Land Seed Mix $ 3,329.00 <br /> Weed Control— 10%of Reseeded Areas Four Times $ 3,488.00 <br /> Subtotal of direct costs(rounded to nearest dollar) $ 18,903.00 <br /> Indirect Costs(rounded to nearest dollar) $ 4,646.00 <br /> Total Amount $ 23,549.00 <br /> 60%of Total Amount(Phase I) $ 14,129.00 <br /> Proposed Decision and Findings of Compliance May 28,2021 <br /> Partial Phase I Bond Release SL-20 Page 10 <br />