Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles, drill pads and collar areas of underground workings,ponds, etc. <br /> Two 300 feet deep vertical reverse circulation drill holes with each drill site requiring a 50x50 foot drill <br /> pa oo eep . CFne new 200 tootroad will needTo-15-e-EOT and one 300 tootprimitive road wi nee <br /> to be improved. <br /> Amount of material to be moved: 2 drill pads x 50ft x 50ft x 1ft deep = 185.2 cubic yards of material <br /> mr)vpfi Tht, new roade,wo,11d move 200 ft Iong x 10 ft wide x I ft ripinP = 74 1 rj lb*r.yards of material <br /> moved. <br /> The grand total of material moved is 259.3 cubic yards. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 2 Width (ft) 50 Length (ft) 50 <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 2 Depth (ft) 300 ft/each (in) approx 6 <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity 0 Width (ft) n/a Length (ft) n/a Depth (ft) n/a <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type, quantity and general dimensions: <br /> None <br /> Form 2—Public File Page 6 of 14 <br />