My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-13_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2021-05-13_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2021 6:51:52 AM
Creation date
5/28/2021 6:49:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
5/13/2021
Doc Name Note
Findings & Cost Estimate (For SL24)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Permit Index Doc Type
Findings
Email Name
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task#TTT Page 5 of 6 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob/demob equipment to maintain/reshape SPI <br /> Site: New Horizon Mine Permit Action: SL24 Permit/Job#: C1981008 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 5/12/2021 County: Montrose Filename: C008-003 <br /> User: JHB <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED,400 HP <br /> (2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT TRAILER(25T,50T, <br /> AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $17.20 $29.63 $38.69 <br /> Operating Cost/Hour: $26.56 $47.02 $55.69 <br /> Operator Cost/Hour: $23.63 $23.63 $23.63 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $67.39 $123.81 $141.54 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> CAT 966H 25.80 $42.87 $67.39 1 $110.26 $67.39 $250.00 <br /> Cat 311D LRR 8'- 14.01 $33.77 $67.39 1 $101.16 $67.39 $250.00 <br /> 6"Stick <br /> Subtotals: $211.42 $134.78 $500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/unit Fleet Size Haul Trip Return Trip <br /> Cost/hr/fleet Cost/hr/fleet <br /> Subtotals: $0.00 $0.00 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: NATURITA <br /> Total one-way travel distance: 4.00 miles <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $1,061.55 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $0.00 <br /> Transportation Cycle Time: <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.