My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-26_GENERAL DOCUMENTS - P2021002
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2021002
>
2021-05-26_GENERAL DOCUMENTS - P2021002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 10:48:38 AM
Creation date
5/27/2021 6:15:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2021002
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
5/26/2021
Doc Name
Returned Mail
From
DRMS
To
Mahogany Energy Resources
Email Name
ACY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: <br /> Site: Shale Core 2020-01 Permit Action: New NOI Permit/Job#: P2021002 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 5/12/2021 County: Rio Blanco Filename: P002-ACY <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> O 1 a Backfill/Grade Pad DOZER 1 1.14 $192 <br /> 02a Backfill/Grade Pit DOZER 1 0.41 $68 <br /> 03a Decom act RIPPER 1 0.41 $73 <br /> 04a Apply topsoil DOZER 1 1.39 $236 <br /> 05a Reveg REVEGE 1 5.00 $1,412 <br /> 06a Remove Exclusion Fence DEMOLISH 1 8.00 $763 <br /> 10a Initial Mobilization MOBILIZE 1 9.00 $2,976 <br /> 1 Ob Secondary Mobilization MOBILIZE 1 3.50 $143 <br /> SUBTOTALS: 28.85 $5,863 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $118 <br /> Performance bond: 1.05 Total= $62 <br /> Job superintendent: 0.00 Total= $0 <br /> Profit: 10.00 Total= $586 <br /> TOTAL O&P= $766 <br /> CONTRACT AMOUNT(direct+O&P)= $6,629 <br /> LEGAL-ENGINEERING -PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0 <br /> Reclamation management and/or administration: 0.00 $0 <br /> CONTINGENCY: 3.00 Total= $176 <br /> TOTAL INDIRECT COST= $942 <br /> TOTAL BOND AMOUNT(direct+indirect)= $6,805 <br />
The URL can be used to link to this page
Your browser does not support the video tag.