My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-12_PERMIT FILE - C1981038A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2021-05-12_PERMIT FILE - C1981038A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 10:29:05 AM
Creation date
5/25/2021 12:53:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
5/12/2021
Section_Exhibit Name
Volume 7 2.05 Operation and Reclamation Plans Paonia Loadout
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These disturbances and facilities were used for over <br />twenty years to provide a method to ship commercial <br />quantities of prepared coal to the national and <br />international steam coal market. <br />Reclamation Status: The disturbances associated with <br />the loadout facilities have not been reclaimed. <br />5. Truck Scales <br />These truck scales are located on an isolated one-way <br />entrance road. The scale bed is located on the <br />roadway with all mechanical features below grade. <br />The scale bed is accompanied by a small 15 foot long <br />by 10 feet wide by 8 foot high steel clad building which <br />houses the scale instrumentation and recorders. <br />These truck scales were installed during the summer of <br />1981 so incoming coal trucks could be weighed. In <br />addition an access ramp was constructed from State <br />Highway 133 to the truck scales and to the truck dump <br />area. Topsoil was excavated for the scales, and the <br />access road. Drainage from the area is directed to the <br />railroad spur drainage and flows downgrade to the train <br />loadout sediment pond. The Operator has approval to <br />improve the entrance to the truck scale. The haul road <br />will be widened so trucks can bypass the scales to the <br />south and east and proceed to the truck dump without <br />crossing the scales. Topsoil will be excavated from the <br />new disturbed area and stockpiled in the area shown <br />on Map 7. <br />Reclamation Status: The truck scales have not been <br />removed from site. <br />RN -07 2.05-7 03/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.