My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-12_PERMIT FILE - C1981038A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2021-05-12_PERMIT FILE - C1981038A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2024 10:29:05 AM
Creation date
5/25/2021 12:53:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
5/12/2021
Section_Exhibit Name
Volume 7 2.05 Operation and Reclamation Plans Paonia Loadout
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Volume I - Text, Section 2.05.3(2) describes the categories of surface <br />disturbances associated with the underground mining activities of the <br />Bowie No. 1 Mine. The following section describes additional types of <br />disturbances associated with the underground mining activities of the <br />Bowie No. 1 Mine related to the train loadout and stockpile areas: <br />The disturbed areas are shown on Map 7 - Loadout Facilities. <br />(3) Mine Facilities <br />(a) New structures. <br />There are no new structures planned for the train loadout and stockpile <br />areas. <br />(b) Existing structures. <br />1. Unmodified structures <br />1. Haul Roads <br />There are three haul roads, entrances/exits, to the train <br />loadout area. See Section 4.03 and Map 12, Haul <br />Road Plan and Profile for additional details. They are <br />numbered from west to east. <br />Haul road number 1 is approximately 350 feet long and <br />provides access to the truck scales. The maximum <br />and average grade for this haul road section is 10% <br />and 3.4% respectively. <br />Haul road number 2 is approximately 300 feet long and <br />provides access to the truck dump. The maximum and <br />average grade for this haul road section is 9.5% and <br />6.7% respectively. <br />RN -07 2.05-4 02/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.