My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-20_REVISION - C1981035 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2021-05-20_REVISION - C1981035 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 11:25:27 AM
Creation date
5/20/2021 11:24:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
5/20/2021
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
GCC Energy, LLC
Type & Sequence
TR30
Email Name
JHB
THM
Media Type
D
Archive
No
Supplemental fields
Permit Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />May 20, 2021 <br /> <br /> <br />Sarah Vance <br />GCC Energy, LLC <br />PO Box 100 <br />Tijeras, NM 87123 <br /> <br /> <br />Re: King Coal Mine (Permit No. C-1981-035) <br /> Proposed Decision - Technical Revision No. 30 (TR-30) <br /> Staging Area and Access Road <br /> <br /> <br />Dear Ms. Vance: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for <br />Technical Revision No. 30 at the King Coal Mine. Notice of the proposed decision will be published <br />in the Durango Herald as soon as possible. The day following the first publication will initiate the <br />ten (10) day public comment period for the Division's decision. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The <br />material should be sent within 15 days of final approval. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br />of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, <br />if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing <br />bond that equals or exceeds the Revised Liability. This Technical Revision must not be implemented <br />until this proposed decision becomes final and until any required increase in bond is submitted to and <br />approved by the Division. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.