Laserfiche WebLink
<br /> <br />1313 Sherman St. Room 215 Denver, CO 80203 P (303) 866-3567 F (303) 832-8106 https://drms.colorado.gov <br />Jared Polis, Governor | Dan Gibbs, Executive Director | Virginia Brannon, Director <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />May 20, 2021 <br /> <br /> <br />Sarah Vance <br />GCC Energy, LLC <br />PO Box 100 <br />Tijeras, NM 87123 <br /> <br /> <br />Re: King Coal Mine (Permit No. C-1981-035) <br /> Proposed Decision - Technical Revision No. 30 (TR-30) <br /> Staging Area and Access Road <br /> <br /> <br />Dear Ms. Vance: <br /> <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision for <br />Technical Revision No. 30 at the King Coal Mine. Notice of the proposed decision will be published <br />in the Durango Herald as soon as possible. The day following the first publication will initiate the <br />ten (10) day public comment period for the Division's decision. <br /> <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The <br />material should be sent within 15 days of final approval. <br /> <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount <br />of Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, <br />if the Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing <br />bond that equals or exceeds the Revised Liability. This Technical Revision must not be implemented <br />until this proposed decision becomes final and until any required increase in bond is submitted to and <br />approved by the Division. <br /> <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br />