Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Final Reclamation SR02 <br /> Site: E 8th Street Operation Permit Action: SR02 Permit/Job#: M2000082 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 5/17/2021 County: Weld Filename: M082-001 <br /> User: ECS <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 002 Mob/Demob MOBILIZE 1 3.33 $2,866 <br /> 003 Revegetate Upland-27 ac REVEGE 1 20.00 $29,586 <br /> 004 Revegetate Shoreline-6 Acres REVEGE 1 40.00 $9,648 <br /> 005 Level Floor of East Pit DOZER 1 13.78 $3,390 <br /> SUBTOTALS: 77•11 $45,490 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $919 <br /> Performance bond: 1.05 Total= $478 <br /> Job superintendent: 20.00 Total— $1,391 <br /> Profit: 10.00 Total— $4,549 <br /> TOTAL O&P= $7,337 <br /> CONTRACT AMOUNT(direct+O&P)— $52,827 <br /> LEGAL- ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 8.59 Total= $4,538 <br /> Reclamation management and/or administration: 5.00 $2,641 <br /> CONTINGENCY: 3.00 Total— $1,365 <br /> TOTAL INDIRECT COST= $16,380 <br /> TOTAL BOND AMOUNT(direct+indirect)= $61,870 <br />