Laserfiche WebLink
COLOWYO COAL COMPANY <br /> SEDIMENTATION POND SUMMARY PROPOSED PLAN-SOUTH TAYLOR MINE PLAN <br /> SECTION 28 WEST TAYLOR WEST TAYLOR <br /> POND POND POND <br /> Active Mining Post-mining <br /> WATERSHED AREA(acres): <br /> Disturbed 00 684 00 <br /> Postmining Topsoiled and Seeded 00 00 747 <br /> Undisturbed 2586 80.5 2191 <br /> 1-2 Year Reclamation 525 53 1567 <br /> 3+Year Reclamation 69 0.0 3787 <br /> Total Area Draining to Pond 31800 1542 8292 <br /> Excluded 00 6749 00 <br /> Total Watershed Area 318.00 829 10 82920 <br /> POND PARAMETERS: <br /> Upstream Toe Elevation Original Ground 70580 74560 74560 <br /> Principal Spillway Invert Elevation 70710 7471.0 7471 0 <br /> Emergency Spillway Invert Elevation 70770 74758 74758 <br /> Top of Embankment 70820 7481 0 7481.0 <br /> Storage Volume Below Emergency Spillway Invert(ac-ft) 831 564 564 <br /> Storage Volume Below Principal Spillway Invert(ac-ft) 3.65 290 290 <br /> Storage Volume Below Lowest Spillway Perforation(ac-ft) 1 67 1 77 1 77 <br /> Principal Spillway Parameters <br /> Type Perforated Riser Perforated Riser Perforated Riser <br /> Riser Diameter(in) 180 180 180 <br /> Riser Height(ft) 66 105 105 <br /> Barrel Diameter(in) 18.0 180 180 <br /> Elevation of Lowest Perforation(s)(ft) 70645 74680 74680 <br /> Size of Perforation(s)(in) 30 30 30 <br /> Number of Perforations per Elevation 20 20 20 <br /> Emergency Spillway Parameters <br /> Type Trapezoidal Trapezoidal Trapezoidal <br /> Diameter(in) N/A N/A N/A <br /> Bottom Width(ft) 300 30.0 300 <br /> Crest Length(ft) 300 300 300 <br /> Side Slopes'z'H 1V(ft) 20 20 20 <br /> HYDROLOGIC/HYDRAULIC PARAMETERS: <br /> Base Flow Rates(cfs) 000 000 000 <br /> 10-Year,24-Hour Storm Event <br /> Precipitation(in) 1 80 1 80 1.80 <br /> Runoff Volume(ac-ft) 1 23 434 7.51 <br /> Principal Spillway Peak Discharge(cfs) 3.80 1.61 1406 <br /> Emergency Spillway Peak Discharge(cfs) 000 000 000 <br /> Peak Surface Water Stage Elevation(ft) 707002 7471.16 7473.74 <br /> Spillway Design Storm 25 yr/24 hr 25 yr/24 hr 25 yr/24 hr <br /> Precipitation(in) 2.30 230 230 <br /> Runoff Volume(ac-ft) 238 1 44 1654 <br /> Combined Princ and Emer Spillway Peak Discharge(cfs) 774 426 5557 <br /> Peak Surface Water Stage Elevation(ft) 7070.64 7471 41 747652 <br /> Pond Freeboard(ft) 11 36 9.59 448 <br /> SEDIMENT LOADING PARAMETERS(10-Year,24-Hour Event): <br /> Storm Predicted Peak Sediment Concentration(in,mg/1) 45,093 702,476 78,287 <br /> Storm Predicted Peak Settl Solids,(out,mi/1) 0.0 00 0.00 <br /> Predicted Annual Sediment Loading(ac-ft) 0.05 01 002 <br /> Max.sediment storage elevation (ft) 705600 7468.0 74680 <br /> Available Sediment Storage Volume(ac-ft) 1 71 2.02 202 <br /> Predicted Number of years to max sed stor EI 342 161 839 <br /> Revision Date: 01/28/19 <br /> Exh. 7-20-2 Revision No.: TR-131 <br />