Laserfiche WebLink
Total area of construction site 50.5 acres <br /> Total area of project disturbance 9.6 acres <br /> F. NATURE OF CONSTRUCTION ACTIVITY <br /> Check the appropriate box(s)or provide a brief description that indicates the general nature of the construction activities.(The full description of <br /> activities must be included in the Stormwater Management Plan.) <br /> ❑ Commercial Development ❑ Residential Development ❑ Highway and Transportation Development <br /> ❑ Pipeline and Utilities(including natural gas,electricity,water,and communications) <br /> ❑ Oil and Gas Exploration and Well Pad Development <br /> ❑ Non-structural and other development(i.e.parks,trails,stream realignment,bank stabilization,demolition,etc.) <br /> 0 Other Surface Mine <br /> G. ANTICIPATED CONSTRUCTION SCHEDULE <br /> Construction Start Date: 05/31/2021 Final Stabilization Date: 04/30/2031 <br /> •Construction Start Date-This is the day you expect to begin ground disturbing activities,including grubbing,stockpiling,excavating,demolition, <br /> and grading activities. <br /> •Final Stabilization Date-in terms of permit coverage,this is when he site is finally stabilized.This means that all ground surface disturbing <br /> activities at the site have been completed and all disturbed areas have either been built on,paved,or a uniform vegetative cover has been <br /> established with an individual plant density of at least 70 percent of pre-disturbance levels. <br /> •Permit coverage must be maintained until the site is finally stabilized.Even if you are only doing one part of the project,the estimated final <br /> stabilization date must be for the overall project.If permit coverage is still required once your part is completed,the permit certification may be <br /> transferred to a new responsible operator. <br /> SIGNATURE REQUIREMENTS: <br /> TERMINATION CERTIFICATION <br /> ❑ By checking this box I understand that by submitting this notice of termination,I am no longer authorized to discharge stormwater <br /> associated with construction activity by the general permit.I understand that discharging pollutants in stormwater associated with <br /> construction activities to the waters of the State of Colorado,where such discharges are not authorized by a CDPS permit,is unlawful <br /> under the Colorado Water Quality Control Act and the Clean Water Act. <br /> 0 STORMWATER MANAGEMENT PLAN CERTIFICATION(on new and renewals) <br /> By checking this box"I certify under penalty of law that a complete Stormwater Management Plan,has been/or will be completed,prior to <br /> the commencement of any construction activity.Based on my inquiry of the person or persons who manage the system,or those persons <br /> directly responsible for gathering the information,the Stormwater Management Plan is/or will be,to the best of my knowledge and belief, <br /> true,accurate,and complete.I am aware that there are significant penalties for falsely certifying the completion of said SWMP,including <br /> the possibility of fine and imprisonment for knowing violations." <br /> THIS PORTION OF THE SIGNATURE LANGUAGE IS REQUIRED ON ALL SUBMITTALS <br /> 1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system <br /> designed to assure that qualified personnel properly gather and evaluate the information submitted.Based on my inquiry of the person or persons <br /> who manage the system,or those persons directly responsible for gathering the information,the information submitted is to the best of my <br /> knowledge and belief,true,accurate and complete.I am aware that there are significant penalties for submitting false information,including the <br /> possibility of fine and imprisonment for knowing violations." <br /> "I understand that submittal of this application is for coverage under the State of Colorado General Permit for Stormwater Discharges Associated <br /> with Construction Activity for the entirety of the construction site/project described and applied for,until such time as the application is amended or <br /> the certification is transferred,inactivated,or expired." <br /> Signature of Operator Date Signed <br /> Name(printed) Title <br /> Signature of Owner Date Signed <br /> Name(printed) Title <br /> 3 OF 4 <br />