Laserfiche WebLink
RULE 2 PERMITS <br /> The topography following mining and reclamation activities is shown on the Postmining <br /> Topography Map (Map 19). Cross sections relating the premining and postmining topographic <br /> configurations are presented as the Premining and Postmining Cross Section Maps (Maps 20 and <br /> 20A). <br /> Coal Handling Structures <br /> Map 1 Surface ownership shows pre-mining contours and Map 19A Postmining Topography <br /> Gossard Area shows post-mining contours of the loadout. All facilities not to be included as part <br /> of the post-mining land use will be removed(see Section 2.05.5). After the facilities are removed, <br /> the land will be regraded to blend with the existing undisturbed topography, retopsoiled and <br /> revegetated in accordance with Section 2.05.4. <br /> The detailed description of the various coal crushing, handling and loadout facilities for the <br /> Colowyo operation is found under the Mine Facilities Section in 2.05.3. The location of the coal <br /> processing facilities is found on the Existing Structures - North Map (Map 21), the Existing <br /> Structures - South Map (Map 22) and the Existing Structures- Lower Wilson/South Taylor Map <br /> (Map 22A). <br /> Coal Processing Waste and Non-Coal Processing Waste <br /> Not applicable. Colowyo uses dry crushing facility for coal preparation; no coal processing waste, <br /> as defined in Rule 1.04 "DEFINITIONS", is produced from any part of the mining operations. <br /> Underground Development Waste <br /> Not applicable. Colowyo is not conducting an underground operation. <br /> Return of Coal Processing Waste to Abandon Workings <br /> Not applicable. No coal processing waste as defined in Rule 1.04 "DEFINITIONS", is produced <br /> from any part of the Colowyo mining operations. <br /> 2.05.4 Reclamation Plan <br /> The objective of the reclamation plan is to stabilize the soil, maintain hydrologic function, re- <br /> establish appropriate vegetation,and to restore the approximate original contour of the mined area. <br /> Ultimately, the areas being mined will be returned to an appropriate and productive post-mining <br /> land use, with watersheds having their approximate pre-mining character. In general, the long <br /> term appearance and beneficial uses of the mined area will be similar to that which would have <br /> been encountered prior to mining activity. <br /> The principal basis of Colowyo's reclamation plan is to rebuild a post mine landscape that mimics <br /> the natural terrain features, accounting for local slope aspects, steepness,and topographic features. <br /> By incorporating variation in the terrain,the reclamation system will encourage the establishment, <br /> sucession, and persistence of mixed native vegetation communities. These efforts will facilitate <br /> Rule 2 Permits 2.05-16 Revision Date: 10/27/20 <br /> Revision No.: TR-143 <br />