Laserfiche WebLink
SEDCAD 4 for Windows <br /> !`nn.,rin h4 100A 9n1n D-1� I Q,k--h <br /> 21 <br /> Structure #Z (Ponds <br /> Streeter Pond <br /> Pond Inputs: <br /> Initial Pool Elev: 6,583.00 ft <br /> Initial Pool: 1.41 ac-ft <br /> *Sediment Storage: 0.00 ac-ft <br /> Dead Space: 20.00% <br /> *No sediment capacity defined <br /> Perforated Riser <br /> Riser Barrel Number of <br /> Riser Height Barrel Barrel Slope Spillway Elev <br /> Diameter (ft) Diameter Length (ft) (o/o) Manning's n (ft) Holes per <br /> (in) (in) Elev <br /> 12.00 3.00 18.00 87.00 4.50 0.0150 6,585.00 2 <br /> Emergency Spillwax <br /> Spillway Elev Crest Length Left Right Bottom <br /> (ft) Sideslope Sideslope Width (ft) <br /> 6,588.00 50.00 1.50:1 1.50:1 20.00 <br /> Pond Results: <br /> Peak Elevation: 6,585.13 ft <br /> H'graph Detention Time: 10.52 hrs <br /> Pond Model: CSTRS <br /> Dewater Time: 1.06 days <br /> Trap Efficiency: 83.41 <br /> Dewatering time is calculated from peak stage to lowest spillway <br /> Elevation-Capacity-Discharge Table <br /> Area Capacity Discharge Dewater <br /> Elevation Time <br /> (ac) (ac-ft) (cfs) (hrs) <br /> 6,579.00 0.045 0.000 0.000 Top of Sed. Storage <br /> 6,580.00 0.140 0.088 0.000 <br /> 6,581.00 0.356 0.328 0.000 <br /> 6,582.00 0.560 0.783 0.000 <br /> 6,583.00 0.692 1.407 0.000 Low hole SPW#1 <br /> 6,584.00 0.873 2.188 0.840 11.24* <br /> 6,585.00 1.159 3.201 1.188 12.20 Spillway#1 <br /> 6,585.13 1.169 3.363 1.518 2.00 Peak Stage <br /> 6,586.00 1.398 4.478 3.782 <br /> Filename: Exhibit 7-14SP Streeter Pond 10 Yr 24 Hr.sc4 Printed 01-19-2021 <br />