My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-05_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2021-04-05_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 6:16:36 AM
Creation date
5/17/2021 2:17:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/5/2021
Doc Name
East Taylor Pond & Permanent Channels
Section_Exhibit Name
Exhibit 07 Item 14 Appendix Exh7-14ET
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEDCAD 4 for Windows <br /> r�.,.,...h 1aaa 001n o�. I, i c..h....k <br /> 18 <br /> Spillway Elev Crest Length Left Right Bottom <br /> (ft) Sideslope Sideslope Width (ft) <br /> 6,954.00 20.00 2.00:1 2.00:1 20.00 <br /> Pond Results: <br /> Peak Elevation: 6,953.49 ft <br /> Dewater Time: 2.92 days <br /> Dewatering time is calculated from peak stage to lowest spillway <br /> Elevation-Capacity-Discharge Table <br /> Area Capacity Discharge Dewater <br /> Elevation Time <br /> (ac) (ac-ft) (cfs) (hrs) <br /> 6,930.00 0.001 0.000 0.000 <br /> 6,931.00 0.036 0.014 0.000 <br /> 6,932.00 0.076 0.069 0.000 <br /> 6,933.00 0.110 0.161 0.000 <br /> 6,934.00 0.134 0.283 0.000 <br /> 6,935.00 0.156 0.428 0.000 <br /> 6,936.00 0.178 0.595 0.000 <br /> 6,937.00 0.201 0.785 0.000 <br /> 6,938.00 0.226 0.998 0.000 <br /> 6,939.00 0.252 1.237 0.000 <br /> 6,940.00 0.280 1.504 0.000 <br /> 6,941.00 0.310 1.799 0.000 <br /> 6,942.00 0.340 2.123 0.000 <br /> 6,943.00 0.373 2.480 0.000 <br /> 6,944.00 0.409 2.871 0.000 Low hole SPW#1 <br /> 6,945.00 0.446 3.298 0.473 10.94* <br /> 6,946.00 0.486 3.764 0.669 8.43* <br /> 6,947.00 0.527 4.270 0.819 7.48* <br /> 6,948.00 0.571 4.819 0.945 7.02* <br /> 6,949.00 0.615 5.412 1.057 6.78* <br /> 6,950.00 0.660 6.049 1.158 7.00 <br /> 6,951.00 0.706 6.732 1.251 6.85 <br /> 6,952.00 0.754 7.462 1.337 6.85 Spillway#1 <br /> 6,953.00 0.804 8.241 8.509 5.00 <br /> 6,953.49 0.831 8.652 10.251 3.80 Peak Stage <br /> 6,954.00 0.857 9.072 12.033 Spillway#2 <br /> 6,955.00 0.975 9.987 63.138 <br /> 6,956.00 1.033 10.991 184.415 <br /> *Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. <br /> Filename: East Taylor Pond 25 Yr 24 Hr Post Mine.sc4 Printed 03-24-2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.