Laserfiche WebLink
-Recipient <br /> Page 2 of 2 <br /> September 3, 2019 <br /> Division on April 6, 2004; <br /> 3. Based on the 2019 Reclamation Cost Estimate this site is significantly under bonded. Mr. <br /> Fontanari shall not make additional excavations(which will increase the site's overall reclamation <br /> liability) in the two north pits. No additional excavations shall be allowed at the site until the <br /> required bond amount is fully submitted and accepted by the Division; <br /> 4. Mr.Fontanari may sell/ship previously mined stockpiled material on site done in accordance with <br /> the specific conditions prescribed in Permit No. M-1996-076,approved by the Division on April 6, <br /> 2004. However,additional material shall not be mined until the required bond amount is posted. <br /> The Division is not granting Mr. Fontanari, or any representative of Western Slope Flagstone Quarry No. <br /> 2, permission to make additional disturbances in the form of additional mining excavations within the <br /> permit boundary until the required bond amount is submitted and accepted by the Division. When the <br /> Operator posts the additional required bond amount of$172,184 for a total bond amount of$260,435, <br /> and the Division accepts in writing,excavation activities may resume at the site. <br /> If you have questions or concerns, please contact Scott Schultz at 720-508-6256. <br /> Sincerely, <br /> Amy Yeldell <br /> Environmental Protection Specialist <br /> Ec: <br /> Trevor Gross <br /> Travis Marshall,Senior EPS, Grand Junction DRMS <br /> Russ Means, Minerals Program Director, DRMS <br /> Scott Schultz,AGO <br /> Jeff Fugate,AGO <br />