Laserfiche WebLink
E 8th Street Operation <br /> New Bond Calculation <br /> May 3, 2021 <br /> Direct Costs Description Cost <br /> Task 001 Backfill Perimeter Slopes and Upland Areas $0.00 <br /> With Overburden <br /> Task 002 Transport and Place Topsoil-9.1 Acres at <br /> 12" Depth $0.00 <br /> Task 003/004/005 Revegitate Shoreline, Upland, Mob/Demob $0.00 <br /> and Hydromulch for 15 Acres ( Original 9.1 Acres ) <br /> Second Application for Potentially One Third $8,000.00 <br /> of Area <br /> TOTAL DIRECT COSTS $8,000.00 <br /> Indirect Costs N/A at this time $0.00 <br /> i <br /> This represents the site as it currenty exists.The <br /> grading,sloping and topsoil placement have all <br /> been completed according to plan.The area has <br /> also been seeded according to plan and waiting <br /> for growth to take place.A copy of the estimate <br /> from an independent contractor to seed the site <br /> is attached. <br />