Laserfiche WebLink
<br /> Page 5 of 9 <br />GENERAL TERMS AND CONDITIONS: <br /> <br />15. This permit and any attachments must be retained and made available for inspection upon <br />request. The permit may be reissued to a new owner by the Division as provided in Regulation <br />Number 3, Part B, II.B upon a request for transfer of ownership and the submittal of a revised <br />APEN and the required fee. <br /> <br />16. If this permit specifically states that final approval has been granted, then the remainder of <br />this condition is not applicable. Otherwise, the issuance of this construction permit is <br />considered initial approval and does not provide "final" approval for this activit y or operation of <br />this source. Final approval of the permit must be secured from the APCD in writing in <br />accordance with the provisions of 25-7-114.5(12)(a) C.R.S. and AQCC Regulation Number 3, <br />Part B, III.G. Final approval cannot be granted until the operation or activity commences and <br />has been verified by the APCD as conforming in all respects with the conditions of the permit. <br />Once self-certification of all points has been reviewed and approved by the Division, it will <br />provide written documentation of such final approval. Details for obtaining final approval to <br />operate are located in the Requirements to Self-Certify for Final Approval section of this <br />permit. The operator must retain the permit final approval letter issued by the Division after <br />completion of self-certification with the most current construction permit. <br /> <br />17. This permit is issued in reliance upon the accuracy and completeness of information supplied <br />by the applicant and is conditioned upon conduct of the activity, or construction, installation <br />and operation of the source, in accordance with this information and with representations <br />made by the applicant or applicant's agents. It is valid only for the equipment and operations <br />or activity(ies) specifically identified in this permit. If subsequent operations or testing at the <br />source indicate the information supplied to obtain this permit and relied upon in the creation <br />and issuance of this permit is inaccurate, the source must submit an application to modify the <br />permit to address the inaccuracy(ies). (Reference: Regulation Number 3, Part B III.E.) <br /> <br /> <br />By: By: <br /> <br /> Aaron Moseley For: R K Hancock III, P.E. <br /> Permit Engineer Construction Permits Unit Supervisor <br /> <br /> <br />Permit History: <br /> <br />Permit History <br />Issuance Date Description <br />Issuance 1 11/29/2000 Final Approval issued to Agile Slone Systems, Inc. <br />Consolidation of two separate permits for the two pits. <br />Issuance 2 9/3/2004 Transfer of ownership from Agile Slone Systems, Inc. to Front <br />Range Aggregates, LLC. Facility is now subject to Operating <br />Permit. Issued as an Initial Approval. <br />Issuance 3 8/1/2006 Final Approvalos IA modification 1. <br />Issuance 4 10/28/2009 FA Modification 2: Decrease throughput of gravel and and <br />gracel mining from 2,875,000 tpy to 2,250,000 tpy. Decrease <br />emission of fugitive PM from 165 tpy to 140.6 tpy, increase <br />emission of PM10 from 33.7 tpy to 40.0 tpy. Decrease of <br />process PM from 2.9 tpy to 1.3 tpy, decrease emission of